Loading...
Mansions Phase 1-LR 980425 (3) I Oallas,~ron Wort~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansions By The Lake Purchase Order Number 3137-D7429-151 [ Date of Observation 4/09/98 Report Date 04/25/98 To Western Rim Services Location BUILDING #9 SLAB - SOUTHWEST CORNER, 15' EAST, 5' NORTH Contractor Supplier LATTIMORE Plant 7 [ Truck 574 Ticket 7049401 Time Sampled 8:10 Time Batched 8:00 Weather Condition CLEAR Concrete Temperature (°F) 69 Ambient Temperature (°F) 72 Mix Number 61 Mix Description 5 SACKS W/R AIR Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 Concrete Cylinder Test(s) [ [ Total Load Compressive Specimen Age Test Date No, (Days) (lbs,) Strength (psi) Strength Required (psi) 81A 7 4/1 $ 93000 3290 3000/28 DAYS B 28 5/07 C 28 5107 D H Curing Method [ TestMethod I Standard 6" x12" I Engineer/TechnicianD-GODBEY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, ~l~l Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the cJients to whom they are addressed. c:\wpwin\reports\D7429-151-98\ST April 25. 1998