Mansions Phase 1-LR 980423 ' flo.~ E.~jlnee,s, In~. ~ ~,4 Goodnlght Lane "TeL (972) 241-4Sl ~'~ RoneEn( ineers
Dallas.-'Fon Worth Dallas. Texas Metro (972) 263-1555
75229 i Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-092A I Date of Observation 3/19/98 Report Date 04/23/98
I
To Western Rim Services
Location SLAB 4, SOUTHEAST CORNER, 8' WEST BY 1' NORTH
Contractor
Supplier LATTIMORE IPlant7 ITruck458 Ticket 7048362
Time Sampled 9:10 Time Batched 9:00 Weather Condition CLOUDY
Concrete Temperature (°F) 63 Ambient Temperature (°F) 56 Mix Number
Mix Description § SACKS W/R AIR Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 3.0
Concrete Cylinder Test(s)
No. (Days} (lbs.) Strength (psi) Strength Required (psi)
49A 7 3/26 103000 3640 3000/28 DAYS
B 28 4/1 6 130000 4600
C 28 4/16 131000 4630
D H
CuringMeth°d I TestMeth°d~ Standard 6" x12" I Engineer/TechnicianD'GODBEY
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, ~, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr, Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.) or any other featqre of similar subject matter provided by
persona or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-092A-98\ST April 23. 1998