Mansions Phase 1-LR 980423 (2) l~one l~n!;j|neer~, In(;.. 11,~'~,4 ~oodnight Lane Tel. (972) 241-451 ~ RoneEn,',ineers
Dallas/Fort Worth I Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 1 of 4
Report No: 3137-D7429-136 Sample Date: April 7. 1998
Client: Western Rim Services Report Date: April 23, 1998
Location: Building//29 Technician: T. Duke
# Tendon Location lack Fomc Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolcrancc
1 B29 West Side 33K 2 1/8 -- *See note
2 S29 West Side 33K 2 1/8 - *See note
3 S48 West Side 33K 3 5/8 -- *Sec note
4 B30 West Side 33K 2 2/8 2 1/4 Y
5 B30 West Side 33K 2 2/8 2 1/4 Y
6 B30 West Side 33K 2 2/8 2 1/2 Y
7 B30 West Side 33K 2 2/8 2 1/4 Y
8 B57 West Side 33K 4 3/8 4 1/2 Y
9 S57 West Side 33K 4 3/8 4 3/8 Y
l0 B78 West Side 33K 6 5 1/2 Y
l 1 S63 South Side 33K 4 7/8 5 Y
12 S62 South Side 33K 4 3/4 4 7/8 Y
13 B62 South Side 33K 4 3/4 4 5/8 Y
14 S62 South Side 33K 4 3/4 4 3/4 Y
15 S62 South Side 33K 4 3/4 5 Y
16 S65 South Side 33K 5 5 Y
17 B65 South Side 33K 5 -- *See no'-
18 S65 South Side 33K 5 - *See note
19 561 South Side 33K 4 5/8 4 518 Y
2quipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments: *Cables #1, 2, 3, 17 & 18: Covered, not pulled. Was not able to confirm gauges due to cables @ 33 were
pulled (~ an earuer / (~ 12.5 time.
Distribution:
(i) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Copper
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIIVIITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-13698\SH April 23, 1998
' Rone Engineers, Inc. 1,'~'~'34 Goodnight Lane Tel. (972) 241-451~'',
Dallas,'For~ Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 2 of 4
Report No: 3137-D7429-136 Sample Date: April 7, 1998
Client: Western Rim Services Report Date: April 23, 1998
Location: Building//29 Technician: T. Duke
# Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure ~longations End (1) End (2) Elongations Tolerance
20 S61 South Side 33K - 4 5/8 4 7/8 Y
21 B64 South Side $3K 4 7/8 5 Y
22 S64 South Side $3K 4 7/8 5 Y
23 S64 South Side 33K 4 7/8 4 7/8 Y
24 S62 South Side 33K 4 3/4 4 7/8 Y
25 S64 South Side 33K 4 7/8 4 3/4 Y
26 B64 South Side 33K 4 7/8 4 7/8 Y
27 S62 South Side 33K 4 3/4 5 Y
28 $62 South Side 33K 4 3/4 5 Y
29 B69 South Side 33K 5 1/4 5 3/8 Y
30 S69 South Side 33K 5 1/4 5 1/4 Y
31 S69 South Side 33K 5 1/4 5 1/8 Y
32 S69 South Side 33K 5 1/4 5 1/8 Y
33 B69 South Side 33K 5 1/4 5 1/4 Y
34 $69 South Side 33K 5 1/4 5 1/4 Y
35 S69 South Side 33K 5 1/4 5 Y
36 $69 South Side 33K 5 1/4 5 1/8 Y
37 $61 South Side 33K 4 5i8 4 1/2 Y
38 B32 South Side 33K 2 3/8 2 1/4 Y
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments:
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City. of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-13698\SH April 23, 1998
Rone Engineers, Inc. 1.*"<~4 Goodnight Lane Tel. (972) 241-451~''' RoneEnoineers
Dallas;Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 3 of 4
Report No: 3137-D7429-136 Sample Date: April 7, 1998
Client: Western Rim Services Report Date: April 23, 1998
Location: Building ~29 Technician: T. Duke
# Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
39 S32 South Side 33K 2 3/8 2 3/8 Y
40 S61 East Side 33K 4 5/8 4 7/8 Y
41 B61 East Side 33K 4 518 4 5/8 Y
42 S70 East Side 33K 5 3/8 5 1/2 Y
43 S98 East Side 33K 7 5/8 7 3/4 Y
44 S101 East Side 33K 7 718 8 1/8 Y
45 S101 East Side 33K 7 7/8 7 7/8 Y
46 B75 East Side 33K 5 3/4 6 Y
47 S102 East Side 33K 7 7/8 7 3/4 Y
48 S10'2 East Side 33K 7 7/8 8 Y
49 S102 East Side 33K 7 7/8 8 1/4 Y
50 B76 East Side 33K 5 7/8 6 3/8 Y
51 S98 East Side 33K 7 5/8 -- *See note
52 S98 East Side 33K 7 5/8 - *See note
53 S98 East Side 33K 7 5/8 -- *See note
54 S98 East Side 33K 7 5/8 - *See nora
55 S101 East Side 33K 7 7/8 -- *See note
56 B74 East Side 33K 5 3/4 -- *See note
57 SI01 East Side 33K 7 7/8 -- ~'See note
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments: *Cables #51 - 57: Covered by concrete drive
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Copper
(1) Mr. Lee Stone; City of Copper
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control.
Our letters and reports are for the exclusive use of the clients to whom they are addressed.
c:\wpwin\reporcs\D742998\SH April 23, 1998
I~o,-,~ I[,',sl.,~r~, I,~,~. t ~-~4 Goodnlght Lane Tel. (972) 241-4517.-.. ineers
Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansions By The Lake Page: 4 of 4
Report No: 3137-D7429-136 Sample Date: April 7. 1998
Client: Western Rim Services Report Date: April 23, 1998
Location: Building//29 Technician: T. Duke
# Tendon l.,o~ation /ack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressur~ Elongations End (1) End (2) Elongations Tolerance
58 SIO1 East Side 33K 7 7/8 * *ce note
59 SI01 Fast Side 33K 7 7/8 8 Y
60 B79 Fast Side 33K 6 1/8 6 1/'2 Y
61 515 East Side 33K 1 -- *See note
62 527 East Side 33K 2 2 Y
63 S27 Fast Side 33K 2 1 15/16 Y
64 B27 East 51de 33K 2 2 Y
Equipment ID: Ram No: Pump No: Gauge No:
Equipment Calibration Date:
Comments: *Cable #58: Covered by concrete drive. *Cable # 61: Covered, not pulled.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(I) Mr. Larry Davis; City of Copper
(1) Mr. Le~ Stone; City of Copper
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon tho specific samples provided for testing. We assume no responsibility for variation in
quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no comrol.
Our letters and reports are for the exclusive use of the clients to whom they are addressed.
¢:\wpwin\reports\D742998\SH April 23, 1998