Loading...
Mansions Phase 1-LR 980428 (6)Dallas,.'Forl Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 GENERAL REPORT PROJECT: Mansions By The Lake REPORT NO: 3137-D7429-177 REPORT DATE: 04/28/98 CLIENT: Western Rim Services COLLECTION DATE: 04/23/98 REPORT OF: Cylinder Collection On the above collection date, Demetrius Godbey, representing Rone Engineers, Inc., arrived on site at the above referenced project to pick up concrete cylinders made on April 21, 1998 for compressive strength testing. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMI'rATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mauer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:~,'l~,'in~.s~po~,.~\D7429-1~'Y79~SH April ~. 1998 x'~\