Loading...
Mansions Phase 1-LR 980422 (4) Rone Engineers; Inc. ~ 34 Goodmght Lane Tel. (972) 241-4E RoneEnl ineers Dalla$/Forl Worth Dallas. Yexas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page :2 of 4 Report No: 3137-D7429-161 Sample Date: April 17, 1998 Client: Western Rim Services Report Date: April 22, 1998 Location: BUILDING//40 Technician: Mike Fuller # Tendon Location Jack Fome Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 20 S-61 EAST SIDE 33K 4 518 4 !14 YES 21 B-64 EAST SIDE 33K 4 7/8 5 YES 22 S-.64 EAST SIDE 33K 4 7/8 5 YES 23 S-62 EAST SIDE 33K 4 7/8 5 1/16 YES 24 S44 EAST SIDE 33K 4 314 4 1/2 YES 25 !t-64 EAST SIDE 33K 4 7/8 4 1/2 YES 26 S-62 EAST SIDE 331t[ 4 7/8 4 1/2 YES 27 S.-62 EAST SIDE 33K 4 3/4 4 1/4 YES 28 11-69 EAST SIDE 33K 4 3/4 4 1/2 'YES 29 S-69 EAST SIDE 33K 5 114 .5 1/2 YES 30 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 31 S-69 EAST SIDE 33K 5 114 5 1/2 YES 32 13-69 EAST SIDE 33K 5 114 5 1/2 YES 33 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 34 S-69 EAST SIDE 33K 5 i/4 5 1/2 YES 35 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 36 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 37 S-61 EAST SIDE 33K 4 5/8 4 1/4 YES 38 B-32 EAST SIDE 33K 2 3/8 2 I/2 YES ~quipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Distribution: (I) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented her~in were prepared based upon the ~ecific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leners and reports are for the exclusive us~ of the clients to whom they are addressed. c:\wpwin\reports\DT429-161-gg\ST April 14, 1998 Repull April I?, 1998 - Revised * · . i~one Engineer~, In(;. "~"34 Gooclnight Lane ]'el. (g72) 24~-4£""" Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 3 of 4 Report No: 3137-D7429-161 Sample Date: April 17, 1998 Client: Western Rim Services Report Date: April 22, 1998 Location: BUILDING//40 Technician: Mike Fuller // Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End 6) Elongations Tolerance 39 5-32 EAST SIDE 33K 2 3/8 2 1/2 YES 40 5-61 EAST SIDE 33K 4 5/8 5 YES 41 B-61 EAST SIDE 33K 4 5/8 5 YES 42 S-70 NORTH SIDE 33K 5 3/8 5 1/4 YES 43 5-98 NORTH SIDE 33K 7 5/8 7 3/4 YES 44 5-101 NORTH SIDE 33K 7 7/8 8 YES 45 5-101 NORTH SIDE 33K 7 7/8 7 5/8 YES 46 B-75 NORTH SIDE 33K 5 3/4 6 YES 47 5-102 NORTH SIDE 33K 7 7/8 8 1/16 YES 48 5-102 NORTH SIDE 33K 7 7/8 7 7/8 YES 49 5-102 NORTH SIDE 33K 7 7/8 7 1/2 YES 50 B-76 NORTH SIDE 33K 5 7/8 6 1/2- YES 51 5-98 NORTH SIDE 33K 7 5/'8 7 5/8 YES 52 5-98 NORTH SIDE 33K 7 5/8 7 3/4 YES 53 5-98 NORTH SIDE 33K 7 5/8 8 YES 54 5-98 NORTH SIDE 33K 7 5/8 8 YES 55 5-101 NORTH SIDE 33K 7 7/8 8 YES 56 B-74 NORTH SIDE 33K 5 3/4 6 YES 57 5-101 NORTH SIDE 33K 7 7/8 10 + NO * Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: * + LONG, POSSIBLE UNDER PULL Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIIvlITATION5: The res! r~suits presented her~in were prepared based upon the specific s~mplcs provided for testing. We assume no responsibility for variation in quali~¥ (composition. appearance, performance, etc.) or an.v other feature of similar subject matter provided by persons or conditions over which we have no control. Our leuers and repons are for the exclusive use of the ellen,s to whom they are addressed. c:\wpwin\repor~s\D?429-161-98\ST April 14, 1998 Repull April 17. 1998 - Revised * Dallas/Fort. Worth i Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 4 of 4 Report No: 3137-D7429-161 Sample Date: April 17, 1998 Client: Western Rim Services Report Date: April 22, 1998 Location: BUILDING #40 Technician: Mike Fuller # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 58 S-101 NORTH SIDE 33K 7 7/8 8 YES 59 S-101 NORTH SIDE 33K 7 7/8 7 7/8 YES 60 B-79 NORTH SIDE 33K 6 1/8 6 YES 61 S-15 NORTH SIDE 33K i 2 YES 62 S-27 NORTH SIDE 33K 2 COVERED ** 63 S-27 NORTH SIDE 33K 2 COVERED ** 64 B-27 NORTH SIDE 33K 2 COVERED ** Zquipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: ** DID NOT PULL, COVERED UP Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (I) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are/'or the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-161-98\ST April 14, 1998 Repull April 17, 1998 - Revised *