Loading...
Mansions Phase 1-LR 980421 (2) Dallas/For1 Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-089 Date of Observation 3/17/98 Report Date 04/21/98 To Western Rim Services Location BUILDING 4 SLAB, THE BACK LEFT CORNER OF THE SLAB Contractor LATTIMORE Supplier LATTIMORE IPlant3 ITruck459 Ticket 3059132 Time Sampled 9:00 Time Batched 8:50 Weather Condition CLOUDY Concrete Temperature (°F) 51 Ambient Temperature (°F) 48 Mix Number Mix Description 5 SACKS W/R AIR Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 47A 7 3/24 101000 3s70 3000/28 DAYS C 28 4/14 120000 4240 D H Curing Method Test Method I Standard 6" x 12" I Engineer/'rechnician D. GODBEY ASTM C 31 ASTM C 39I Area 28.27 sq. in. I Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; Citv of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat reaults presented herein were prepared baaed upon the specific aamples provided for testing. We assume no responsibility for variation in quality Icomposition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports~D7429-Oe9-98\ST April 21, 1998