Loading...
Mansions Phase 1-LR 980416 (2) ~ Dallas.-'Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-135 I Date of Observation 4/06/98 Report Date 4/16/98 I To Western Rim Services Location CLUB HOUSE SLAB IN THE WEST, NORTH END, 5' EAST Contractor Supplier LATTIMORE I Plant 7 I Truck 612 Ticket 7049221 I I Time Sampled 11:10 Time Batched 11:00 Weather Condition PT CLOUDY Concrete Temperature (°F} 73 Ambient Temperature (°F) 75 Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 77A 7 4/13 79500 2810 3000/28 DAYS B 28 5/04 112000 3960 C 28 5/04 111000 3930 D H Curing Method Test Method Standard 6" x 12"I Engineer/Technician D. GODBEY ASTM C 31 I ASTM C 39/~ Area 28.27 sq. in. I Signature: Mike Fuller, ~t~ Supervisor, CMT Remarks and/or Distribution ~/- Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hedge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality Icomposition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports~O7429-135-98\ST April 16. 1998