Loading...
Mansions Phase 1-LR 980416 (3) Rone Engineers, Inc. .~34 Goodnight Lane Tel. (972) 241-4~ RoneEn( ineers Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-133 I Date of Observation 4/06/98 Report Date 04/16/98 I To Western Rim Services Location BUILDING //29, SOUTHWEST END, 10' NORTH, 5' EAST Contractor Supplier LAq-i'IMORE Plant 3 I Truck 735 Ticket 3060357 Time Sampled 9:00 Time Batched 8:50 Weather Condition PT CLOUDY Concrete Temperature (°F) 69 Ambient Temperature (°F) 73 Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 7 1/2 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 75A 7 4/13 73000 2580 3000/28 DAYS B 28 5/04 C 28 5/04 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY ASTM C 31 I ASTM C 39 Area 28.27 sq. in. I Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We assume no responsibility for variation in quality Icomposition, appearance, performance, etc.) or any other feature of similar subject mat'tar provided by persons or conditions over which we have no control. Our letters and reports ere for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-133-98\ST April 16, 1998~(v~/_