Loading...
Mansions Phase 1-LR 980415 Rone Engineers. Inc. 11 ? Goodnight Lane Tel. (972) 241-4517 '-" RoneEngineers Dal~as,'Fon Worth Dallas, Texas Mel:ro (972) 263-1555 ~~ 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-122 Date of Observation 3/31/98 Report Date 04/15/98 To Western Rim Services Location BUILDING #34 - NORTH 50' SOUTH, 3' EAST Contractor Supplier LATTIMORE Plant 7 I Truck 458 Ticket 7048908 Time Sampled 11:50 Time Batched 11:40 Weather Condition CLEAR Concrete Temperature (°F) 70 Ambient Temperature {°F) 72 Mix Number 14 Mix Description 4.50 SACKS Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) -- ENTRAINED AIR (%) -- Concrete Cylinder Test(s) I I Total Load Compressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 67A 7 4/07 69500 2420 3000/28 DAYS B 28 4/28 C 28 4/28 D H Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician D. GODBEY ASTM C 31 I ASTM C 39 ti Area 28.27 sq. in. I Signature: Mike Fuller, ~J Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\roports~D7429-122-98~ST April 15. 1998