Loading...
Mansions Phase 1-LR 980415 (2) Rone Engineers, Inc. I l~'-t Goodnight Lane Tel. (972) 241-4517~'' ineers DaHas,.Forl Worlh Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-123 I Date of Observation 3/31/98 Report Date 04/15/98 I To Western Rim Services Location BUILDING //34, WEST SIDE, 14' EAST, 10' NORTHEAST Contractor Supplier LATTIMORE IPlant7 ITruck610 Ticket 7048917 Time Sampled 10:40 Time Batched 10:30 Weather Condition CLEAR Concrete Temperature (°F) 70 Ambient Temperature (°F) 72 Mix Number 14 Mix Description 4.50 SACKS Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 8.0 Concrete Cylinder Test(s) I IT°tal L°ad C°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 68A 7 4/07 74000 2620 3000/28 DAYS B 28 4/28 C 28 4/28 D H Curing Method Test Method I Standard 6" x 12" I Engineer/Technician D. GODBEY Area sq. ASTM C 31 I ASTM C 39 ~ 28.27 in. I Signature: Mike Fuller, (~/'Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Mike Hodge; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-123-98\ST April 15, 1998