Mansions Phase 1-LR 980415 (5) Ro~e E.gi.eers. I.e. 11~4 Goodn,ght Lane Tel. (972) 241-4517~. RoneEnqineers
Da ,as,'Fo¢, Worm Dallas. Texas Metro (972) 263-1
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-127 Date of Observation 4/02/98 Report Date 04/15/98
To Western Rim Services
Location BUILDING #36, GRADE BEAMS
Contractor
Supplier LATTIMORE MATERIALS I Plant 7 I Truck 611 Ticket 7049064
I
I
Time Sampled 10:45 Time Batched 9:50 Weather Condition PT CLOUDY
Concrete Temperature (°F) 72 Ambient Temperature (°F) 78 Mix Number 14
Mix Description 4.50 SACKS W/R Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.5
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
7 lA 7 4/09 68000 2410 3000/28 DAYS
B 28 4/30
C 28 4/30
D H
Curing Method I TestMethod Standard 6" x12" I Engineer/TechnicianR. YARBROUGH
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Mike Fuller, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by
persona or conditions over which we have no control. Our letters and reports are for the exclusive uae of the clients to whom they are
addressed.
c:\wpwin\reports~D7429-127-98~ST April 15, 1998