Mansions Phase 1-LR 980415 (8) Rone Engineers, InC. . t l ~" ~oOanlgn~ Lane 1'~. ~?~ ~-4S~7'' ineers
Dal~as,'Fort Worl~ Dallas. lexas Metro (972) 263-1555
75229 Fax (972) 24'1-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-083 I Date of Observation 3/12/98 Report Date 04/15/98
I
To Western Rim Services
Location BUILDING 25, IN THE MIDDLE SIDE, 10' DOWN
Contractor
Supplier LATTIMORE Plant 7 I Truck 755 Ticket 7048118
Time Sampled 10:10 Time Batched 10:00 Weather Condition CLEAR
Concrete Temperature (°F) 57 Ambient Temperature (°F) 39 Mix Number
Mix Description 5 SACKS W/R AIR Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 7.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
44A 7 3/19 73000 2580 3000/28 DAYS
B 28 4/09 99500 3520
C 28 4/09 92500 3270
D H
Curing Method I Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY
ASTM C 31 I ASTM C 39 Area 28.27 sq. in.
I
Signature: Mike Fuller, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O83-98\ST April 15. 1998 ~