Loading...
Mansions Phase 1-LR 980415 (8) Rone Engineers, InC. . t l ~" ~oOanlgn~ Lane 1'~. ~?~ ~-4S~7'' ineers Dal~as,'Fort Worl~ Dallas. lexas Metro (972) 263-1555 75229 Fax (972) 24'1-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-083 I Date of Observation 3/12/98 Report Date 04/15/98 I To Western Rim Services Location BUILDING 25, IN THE MIDDLE SIDE, 10' DOWN Contractor Supplier LATTIMORE Plant 7 I Truck 755 Ticket 7048118 Time Sampled 10:10 Time Batched 10:00 Weather Condition CLEAR Concrete Temperature (°F) 57 Ambient Temperature (°F) 39 Mix Number Mix Description 5 SACKS W/R AIR Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 7.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 44A 7 3/19 73000 2580 3000/28 DAYS B 28 4/09 99500 3520 C 28 4/09 92500 3270 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY ASTM C 31 I ASTM C 39 Area 28.27 sq. in. I Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O83-98\ST April 15. 1998 ~