Mansions Phase 1-LR 980414 (03) · ,o~ E~,' ...... (,-,~. '< '~.~. ~oo<:{~{9~,& L~,~ T~{. (~72/24~-45~ "~ RoneEn( ineers
Da~las,.'Forl WorthDallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: Western Rim Services PROJECT: Mansion By The Lake
DATE: April 14, 1998 OUR REPORT NO.: 3137-D7429-007
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Yards of Added Slump Content Temp Temp
No Made Number Loaded Sampled Concrete (Gal) {In) (%) °F °F
82 4 7049576 7:00 7:10 10 0 8 N/A 69 85
83 4 6070027 8:20 8:30 10 0 4 1/2 N/A 70 79
84 4 7049599 10:50 11:00 10 0 6 N/A 70 84
LOCATION:
82 BUILDING 35 SLAB FROM SOUTHWEST CORNER, 45' NORTH AND 6' EAST
83 BUILDING 35 SLAB FROM SOUTHWEST CORNER, 47' NORTH AND 25' EAST
84 BUILDING 34 SLAB FROM NORTHEAST CORNER, 25' WEST AND 3' SOUTH
REMARKS:
TECHNICIAN: D. Godbey
DISTRIBUTION:
(1) Mr. Richard E. Simmons; Western Rim Services
(1} Mr. Larry Davis; City of Coppell
{1) Mr. Mike Hodge; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
Mike Fuller
CMT Supervisor
Rone Engineers, Inc.
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition. appearance, performance, etc.} or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-OOT-98\ST April 23, 1998