Loading...
Mansions Phase 1-LR 980414 (07) Rone Engineers, Inc. 34 Goodnight Lane Tel. (972) 241-4[ RoneEnoineers Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 1 of 4 Report No: 3137-D7429-161 Sample Date: April 17, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: BUILDING #40 Technician: Mike Fuller # Tendon Location lack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance I B-29 SOUTH SIDE 33K 2 1/8 2 1/2 YES 2 S-29 SOUTH SIDE 33K 2 1/8 2 I/8 YES 3 S-48 SOUTH SIDE 33K 3 1/2' 2 1/8 YES 4 B-30 SOUTH SIDE 33K 2 2/8 2 1/2 YES 5 B-30 SOUTH SIDE 33K 2 2/8 2 1/2 YES 6 B-30 SOUTH SIDE 33K 2 2/8 2 1/2 YES 7 B-30 SOUTH SIDE 33K 2 2/8 2 1/8 YES 8 B-57 EAST SIDE 33K 4 3/8 4 1/2 YES 9 S-57 EAST SIDE 33K 4 3/8 4 1/2 YES 10 B-78 SOUTH SIDE 33K 5 7/8* 5 YES I1 S-63 EAST SIDE 33K 4 7/8 4 1/2 YES 12 S-62 EAST SIDE 33K 4 3/4 4 1/2 YES 13 B-62 EAST SIDE 33K 4 3/4 5 YES 14 S-62 EAST SIDE 33K 4 3/4 4 1/4 YES 15 S-62 EAST SIDE 33K 4 3/4 5 1/16 YES 16 S-65 EAST SIDE 33K 5 5 YES 17 B-65 EAST SIDE 33K 5 5 YES 18 S-65 EAST SIDE 33K 5 4 3/4 YES 19 S-61 EAST SIDE 33K 4 5/8 4 1/4 YES -~xtuipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: *SHORT Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients Io whom they are addressed. c:\wpwin\reports\D7429-161-98\ST April 14, 1998 Repull April 17, 1998 - Revised * ( ~ j RoneEngineers, lnc. 34 Goodnight Lane Te,.(97 ) RoneEn ineers Dal~as.;Fort Worth Dallas, Texas Metro (972) 263-1555 , 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page I of 4 Report No: 3137-D7429-127A Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: BUILDING #40 Technician: Mike Fuller # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance I B-29 SOUTH SIDE 33K 2 1/8 2 112 YES 2 S-29 SOUTH SIDE 33K 2 1/8 2 i/8 YES 3 S-48 SOUTH SIDE 33K 3 518 2 1/8 NO * 4 B-30 SOUTH SIDE 33K 2 218 2 1/2 YES 5 B-30 SOUTH SIDE 33K 2 218 2 112 YES 6 B-30 SOUTH SIDE 33K 2 2/8 2 1/2 YES 7 B-30 SOUTH SIDE 33K 2 218 2 1/8 YES 8 B-57 EAST SIDE 33K 4 318 4 1/2 YES 9 S-57 EAST SIDE 33K 4 3/8 4 1/2 YES 10 B-78 SOUTH SIDE 33K 6 5 NO * 11 S-63 EAST SIDE 33K 4 7/8 4 1/2 YES 12 S-62 EAST SIDE 33K 4 3/4 4 1/2 YES 13 B-62 EAST SIDE 33K 4 314 5 YES 14 S-62 EAST SIDE 33K 4 3/4 4 I/4 YES 15 S-62 EAST SIDE 33K 4 3/4 5 1/16 YES 16 S-65 EAST SIDE 33K 5 5 YES 17 B-65 EAST SIDE 33K 5 5 YES 18 S-65 EAST SIDE 33K 5 4 3/4 YES 19 S-61 EAST SIDE 33K 4 5/8 4 1/4 YES ~quipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: *SHORT Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-127A-98\ST April 14, 1998 Rone Engineers, Inc. 34 Goodmght Lane Tel. (972)241-45 Ronei::n_qineerS Dallas./Forl Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 2 of 4 Report No: 3137-D7429-127A Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: BUILDING//40 Technician: Mike Fuller # Tendon Location .lack Fore Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 20 S-61 EAST SIDE 33K 4 5/8 4 1/4 YES 21 B-64 EAST SIDE 33K 4 7/8 5 YES 22 S-64 EAST SIDE 33K 4 7/8 5 YES ~ S-62 EAST SIDE 33K 4 7/8 5 1/16 YES 24 S-64 EAST SIDE 33K 4 3/4 4 1/2 YES ~ B-64 EAST SIDE 33K 4 7/8 4 1/2 YES 26 S-62 EAST SIDE 33K 4 7/8 4 1/2 YES 27 S-62 EAST SIDE 33K 4 3/4 4 1/4 YES 28 B-69 EAST SIDE 33K 4 3/4 4 1/2 YES 29 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 30 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 31 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 32 B-69 EAST SIDE 33K 5 1/4 5 1/2 YES 33 S-69 EAST SIDE 33K 5 1/4 5 1,e2 YES 34 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 35 S-69 EAST SIDE 33K 5 1/4 5 1/2 YES 36 S-69 EAST SIDE 331(. 5 1/4 5 1/2 YES 37 S-61 EAST SIDE 33K 4 5/8 4 ]/4 YES 38 B-32 EAST SIDE 33K 2 3/8 2 1/2 YES Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIIVIITATIONS: The test results presented herein were prepared b-'~sed upon the spe,:ific samples provided for tesling. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and repo~s are for the exclusive use oflhe clients to whom hhey are addressed. c:\wpwin\reports\D7429-127A-98\ST April 14, 1998 Rone Engineers. Inc. 34 Goodnight Lane Tel. (972) 241-45 ineers Dallas/Eon Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 3 of 4 Report No: 3137-D7429-127A Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: BUILDING//40 Technician: Mike Fuller # Tendon Location .lack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 39 S-32 EAST SIDE 33K 2 3/8 2 1/2 YES 40 S-61 EAST SIDE 33K 4 5/8 5 YES 41 B-61 EAST SIDE 33K 4 5/8 5 YES 42 S-70 NORTH SIDE 33K 5 3/8 5 I/4 YES 43 S-98 NORTH SIDE 33K 7 5/8 7 3/4 YES 44 S-101 NORTH SIDE 33K 7 7/8 8 YES 45 S-101 NORTH SIDE 33K 7 7/8 7 5/8 YES 46 B-75 NORTH SIDE 33K 5 3/4 6 YES 47 S-102 NORTH SIDE 33K 7 7/8 8 1/16 YES 48 S-102 NORTH SIDE 33K 7 7/8 7 7/8 YES 49 S-102 NORTH SIDE 33K 7 7/8 7 1/2 YES 50 B-76 NORTH SIDE 33K 5 7/8 6 1/:2 YES 51 S-98 NORTH SIDE 33K 7 5/8 7 5/8 YES 52 S-98 NORTH SIDE 33K 7 5/8 7 314 YES 53 S-98 NORTH SIDE 33K 7 5/8 8 YES 54 S-98 NORTH SIDE 33K 7 5/8 8 YES 55 S-101 NORTH SIDE 33K 7 7/8 8 YES 56 B-74 NORTH SIDE 33K 5 3/4 6 YES 57 S-101 NORTH SIDE 33K 7 7/8 10 NO * ]~quipment 1D: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: * + LONG, POSSIBLE UNDER PULL Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Lan')' Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared based upon the specific samples provided for testing. We aasume no responsibility for variation in quality (composition. appearance, pcri'ormance, etc.) or any other feature o£ similar subject matter provided by persons or eonditlons over which we have no control. Our lencrs and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-127A-98\ST April 14, 1998 i Rone Engineers, Inc. 34 Goodnight Lane Tel. (972)241-45 RoneEncfin r i Dallas.;Forl Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 4 of 4 Report No: 3137-D7429-127A Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: BUILDING//40 Technician: Mike Fuller # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 58 S-101 NORTH SIDE 33K 7 7/8 8 YF..S 59 S-101 NORTH SIDE 33K 7 7/8 7 7/8 YE..S 60 B-79 NORTH SIDE 33K 6 1/8 6 YF..3 61 S-15 NORTH SIDE 33K I 2 YES 62 S-27 NORTH SIDE 33K 2 COVERED ** 63 S-27 NORTH SIDE 33K 2 COVERED ** 64 B-27 NORTH SIDE 33K 2 COVERED ** Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: ** DID NOT PULL, COVERED UP Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Dam_ton; C. D. Construction Consulting LI3.11TATIONS: The test results presented herein were prepared based upon the spegific samples provided for testing. We assume no responsibility for variation in quality (:omposition, appearan:e, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\repons\D7429-127A-98',ST April 14, 1998