Loading...
Northlake 635(2)-CS 970902To: From: Matt Cast, Supt. of Public Services Greg Sones, Chief Building Official Travis C~ Int~.x~a Fire Marshal L~~~oo~tmction Inspector Final WALK-THRU for Lincoln Property Belt Line Date: September 2, 1997 A final walk-thru for water, sewer and paving on the referenced scheduled for Wednesday, September 3, 1997 at 2:00 p.m. If I can be of further assistance please let me know. cc: Butler Construction file/ldavis/Owalkthru.mm at Wrangler Croject has been