Loading...
Mansions Phase 1-LR 980414 (08) Rone Engineers, Inc. 1 34 Goodnight Lane . Tel. (972) 241-45. RoneEngineers Dallas/For1 Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 1 OF 4 Report No: 3137-D7429-127B Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: Building//41 Technician: Mike Fuller tt Tendon Location .lack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure F_.longations End (1) End (2) Elongations Tolerance I B-29 NORTH SIDE 33K 2 1/8 2 1/8 YES 2 S-29 NORTH SIDE 33K 2 1/8 2 1/4 YES 3 S-48 NORTH SIDE 33K 3 5/8 3 518 YES 4 B-30 NORTH SIDE 33K 2 2/8 2 5/8 YES 5 B-30 NORTH SIDE 33K 2 2/8 2 1/2 YES 6 B-30 NORTH SIDE 33K 2 2/8 2 1/2 YES 7 B-30 NORTH SIDE 33K 2 2/8 2 1/2 YES 8 B-57 WEST SIDE 33K 4 3/8 4 1/8 YES 9 S-57 WEST SIDE 33K 4 3/8 3 1/2 + NO * 10 B-78 SOUTH SIDE 33K 6 5 1/2 YES 11 S-63 WEST SIDE 33K 4 7/8 5 YES 12 S-62 WEST SIDE 33K 4 3/4 5 YES 13 B-62 WEST SIDE 33K 4 3/4 5 YES 14 S-62 WEST SIDE 33K 4 3/4 5 YES 15 S-62 WEST SIDE 33K 4 3/4 5 YES 16 S-65 WEST SIDE 33K 5 5 1/8 YES 17 B-65 WEST SIDE 33K 5 5 1/4 YES 18 S-65 WF_,ST SIDE 33K 5 5 YES 19 S-61 WEST SIDE 33K 4 5/8 6 + NO * Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: *SHORT, + LONG, POSSIBLE UNDER PULL Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMFFA'I'IONS: Thc test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (cmnposition, appearance, perfom~ance, etc.) or an}' other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and r~pons ar~ for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-127B-98\$T April 14. 1998 Da,asfFoc, Worth Dallas. Texas Metro (972) 263-1555 75229 , Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 2 OF 4 Report No: 3137-D7429-127B Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: Building #41 Technician: Mike Fuller # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (I) End (2) Elongations Tolerance 20 S-61 WEST SIDE 33K 4 5/8 5 YES 21 B-64 WEST SIDE 33K 4 7/8 5 1/8 YES 22 S-64 WEST SIDE 33K 4 7/8 5 1/8 YES 23 S-64 WEST SIDE 33K 4 7/8 5 YES 24 S-62 WEST SIDE 33K 4:3/4 5 114 YES 25 S-64 WEST SIDE 33K 4 7/8 5 1/4 YES 26 B-64 WEST SIDE 33K 4 7/8 5 YES 27 S-62 WEST SIDE 33K 4 3/4 5 YES 28 S-62 WEST SIDE 33K 4 3/4 5 + NO * 29 B-69 WEST SIDE 33K 5 1/4 5 1/2 YES 30 S-69 WEST SIDE 33K 5 1/4 5 1/2 YES 31 S-69 WEST SIDE 33K 5 1/4 5 1/2 YES 32 S-69 WE, ST SIDE 33K 5 1/4 5 518 YES 33 B--69 WEST SIDE 33K 5 I/4 5 3/4 YES 34 S-69 WEST SIDE 33K 5 1/4 5 3/4 YES 35 $-69 WEST SIDE 33K 5 1/4 5 1/2 YES 36 $-69 WE3T SIDE 33K 5 1/4 5 I/2 YES 37 S-61 WEST SIDE 33K 4 5/8 4 7/8 YES 38 B-32 WEST SIDE 33K 2 3/8 2 3/8 + NO * Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: *SHORT, + LONG, POSSIBLE UNDER PULL Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (I) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMFTATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the ellents to whom they are addressed. c:\wpwin\r~ports\D7429-127B-98\ST April 14, 1998 Rone Engineers, Inc. '~ 2,4 Goodnight Lane Tel. (972) 241-45. ineers Dallas.'Fo~ Woqn Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 3 OF 4 Report No: 3137-D7429-127B Sample Date: April 2, 1998 Client: Western Rim Services Report Date: April 14, 1998 Location: Building//41 Technician: Mike Fuller # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2_) Elongations Tolerance 39 S-32 WEST SIDE 33K 2 3/8 2 3/8 YES 40 S-61 SOUTH SIDE 33K 4 5/8 4 1/2 YES 41 B-61 SOUTH SIDE 33K 4 5/8 4 NO * 42 S-70 SOUTH SIDE 33K 5 3/8 5 3/4 YES 43 S-98 SOUTH SIDE 33K '7 5/8 8 YES 44 S-101 SOUTH SIDE 33K 7 7/8 8 1/16 YES 45 $-101 SOUTH SIDE 33K 7 7/8 8 YES 46 B-75 SOUTH SIDE 33K 5 3/4 6 YES 47 S-102 SOUTB SIDE 33K 7 7/8 7 7/8 YES 48 S-102 SOUTH SIDE 33K 7 7/8 8 YES 49 S-102 SOUTH SIDE 33K ? 7/8 7 7/8 YES 50 B-76 SOUTH SIDE 33K 5 7/8 5 3/4 YES 51 S-98 SOUTH SIDE 33K 7 5/8 7 3/4 YES 52 S-98 SOUTH SIDE 33K 7 5/8 7 3/4 YES 53 S-98 SOUTH SIDE 33K 7 5/8 8 1/16 YES 54 S-98 SOUTH SIDE 33K 7 5/8 7 3/4 YES 55 S-101 SOUTH SIDE 33K 7 7/Ii 8 YES 56 B-74 SOUTH SIDE 33K 5 3/4 6 YES 57 S-101 SOUTH SIDE 33K 7 7/8 8 YES t~quipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: *SHORT Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in qualily (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leucrs and repod, s are for the exclusive use of the clients to whom the)' are addressed. e:\wpwin\reports\D7429-127B-98\ST ~pril 14, 1998 Rone Engineers, Inc. 34 Goodnight Lane Tel. (972) 241-45 RoneEn ineers Dallas/Forl Worlh Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 4 OF 4 Report No: 3137-D7429-127B Sample Date: April 2, 1998 Client: Western Rim Semices Report Date: April 14, 1998 Location: Building//41 Technician: Mike Fuller # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. 0Gps) Pressure Elongations End (1) End (2) Elongations Tolerance 58 S-101 SOUTH SIDE 33K 7 7/8 8 3/4 59 S-101 SOUTH SIDE 33K 7 7/8 8 60 B-79 EAST SIDE 33K 6 1/8 7 1/8 61 S-15 EAST SIDE 33K I 2 62 S-27 EAST SIDE 33K 2 2 63 S-27 EAST SIDE 33K 2 2 64 B-27 EAST SIDE 33K 2 2 Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: * + LONG, POSSIBLE UNDER PULL Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Copp¢ll (1) Mr. Tony Martin; Newport Classic (I) Mr. Doyle Damron; C. D. Construction Consulting LIIMITATIONS: The test results presented herein were prepared based upon the spezific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, perfornmn;:e, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. e:\wpwin\reports\D7429-127B-98\ST April 14, 1998