Loading...
Northlake 635(2)-CS 970509To: From: RE: Matt Cast, Supt. of Public Services Greg Jones, Chief Building Official Travis Crump, Interim Fire Marshal Larry Davis, Collstrtlction Illspector~l~ i~ ~~'~ WALK-THRU for Temporary Release Lincoln Property / Building 1 (Belt Line at Wrangle~ Date: May 9, 1997 A walk-thru for the referenced project has been scheduled for Tuesda} at 8:00 a.m. for fire line vault inspection and domestic meter inspectic If I can be of further assistance please let me know. file/ldavis/Owalkthru, mm May 13, 1997 1.