Northlake 635(2)-CS 970509To:
From:
RE:
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Travis Crump, Interim Fire Marshal
Larry Davis, Collstrtlction Illspector~l~ i~ ~~'~
WALK-THRU for Temporary Release
Lincoln Property / Building 1 (Belt Line at Wrangle~
Date: May 9, 1997
A walk-thru for the referenced project has been scheduled for Tuesda}
at 8:00 a.m. for fire line vault inspection and domestic meter inspectic
If I can be of further assistance please let me know.
file/ldavis/Owalkthru, mm
May 13, 1997
1.