Loading...
Mansions Phase 1-LR 980413 Rone Engineers, Inc. 111~' Goodnight Lane Tel. (972) 244-~597 "'~. [3al~as,'Fo~ Wor~ Datlas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-074 I Date of Observation 3/04/98 Report Date 04/13/98 ! To Western Rim Services Location PAVING, FIRE LANE, WEST SIDE AT SOUTHWEST CORNER OF BUILDING //39 Contractor Supplier LATTIMORE I Plant 7 I Truck 573 Ticket 7047701 I I Time Saml01ed 12:00 Time Batched 11:19 Weather Condition PT CLOUDY Concrete Temperature (°F) 64 Ambient Temperature (OFI 68 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) [ i I T°tal L°ad JC°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 38A 7 3/11 62000 2190 3000/28 DAYS B 28 4/01 99000 3500 C 28 4/01 93000 3290 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, {~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell {1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared baaed upon the specific samples provided for testing. Wa assume no responsibility for variation in quality (composition. appearance, performance, arc,) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports ara for the exclusive uae of the client~ to whom they are addressed. c:'~wpwin~reporta~D7429-O74-98~ST April 13, 1998 Rone Engineers, Inc. 11234 odnight Lane Tel. (972) 241-4517 ~ RoneEn_qineers Dallas/For1 Worm Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-075 Date of Observation 3104/98 Report Date 04/13/98 To Western Rim Services Location PAVING, FIRE LANE, EAST SIDE OF SOUTHEAST CORNER OF BUILDING //34 Contractor Supplier LATTIMORE Plant 7 I Truck 458 Ticket 7047718 Time Sampled 2:45 Time Batched 2:09 Weather Condition PT CLOUDY Concrete Temperature {°F) 64 Ambient Temperature (°F) 68 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.75 ENTRAINED AIR (%) 4.9 Concrete Cylinder Test(s) I J IT°tal L°ad C°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 39A 7 3/11 78000 2760 3000/28 DAYS B 28 4/01 110000 3890 C 28 4/01 107000 3780 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; Ciw of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc,) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports~,D7429-075-ea~ST April 13. 1998