Loading...
Mansions Phase 1-LR 980413 (2) Dalla$/Forl, Worth Dallas. Texas Metro (972) 263-1555 75220 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-076 Date of Observation 3~04~98 Report Date 04/13/98 To Western Rim Services Location PAVING, FIRE LANE, SOUTH SIDE OF SOUTHEAST CORNER OF BUILDING //5 Contractor Supplier LATTIMORE IPlant6 ITruck736 Ticket 6067554 Time Sampled 4:35 Time Batched 3:39 Weather Condition PT CLOUDY Concrete Temperature (°F) 72 Ambient Temperature (OF) 68 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.5 ENTRAINED AIR (%) 4.8 Concrete Cylinder Test(s) No. (Days) (lbs.) Strength (psi) Strength Required (psi) 40A 7 3/11 83000 2940 3000/28 DAYS B 28 4/01 115000 4070 C 28 4/01 11 8000 4170 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, \\\1 Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters end reports are for the exclusive use of the clients to whom they are addressed. c:~wpwin~reports\D7429-076-9e~ST April 13, 1998