Mansions Phase 1-LR 980413 (2) Dalla$/Forl, Worth Dallas. Texas Metro (972) 263-1555
75220 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-076 Date of Observation 3~04~98 Report Date 04/13/98
To Western Rim Services
Location PAVING, FIRE LANE, SOUTH SIDE OF SOUTHEAST CORNER OF BUILDING //5
Contractor
Supplier LATTIMORE IPlant6 ITruck736 Ticket 6067554
Time Sampled 4:35 Time Batched 3:39 Weather Condition PT CLOUDY
Concrete Temperature (°F) 72 Ambient Temperature (OF) 68 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.5
ENTRAINED AIR (%) 4.8
Concrete Cylinder Test(s)
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
40A 7 3/11 83000 2940 3000/28 DAYS
B 28 4/01 115000 4070
C 28 4/01 11 8000 4170
D H
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Kevin Tucker, \\\1 Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters end reports are for the exclusive use of the clients to whom they are
addressed.
c:~wpwin~reports\D7429-076-9e~ST April 13, 1998