Mansions Phase 1-LR 980413 (5) Rone Engineers, Inc. 112.'~"-~.~ooclnigl3t Lane Tel. (972) 24~-4~7 Rone Engineers
Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-073 I Date of Observation 3/04/98 Report Date 04/13/98
To Western Rim Services
Location PAVING, FIRE LANE, SOUTH SIDE AT SOUTHEAST CORNER OF BUILDING //39
Contractor
Supplier LATTIMORE IPlant3 ITruck756 Ticket 3058416
Time Sampled 10:10 Time Batched 9:22 Weather Condition PT CLOUDY
Concrete Temperature (°F) 62 Ambient Temperature (°F) 60 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.5
ENTRAINED AIR (%) 4.5
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (13si)
37A 7 3/11 90000 3180 3000/28 DAYS
B 28 4/01 114000 4030
C 28 4/01 114000 4030
D H
ASTM C 31 ASTM C 39/ Area 28.27 SCl. in.
Signature: Kevin Tucker,~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The tea: results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc. I or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports~D742S-073-gS\ST April 13. 1998
Rone Engineers, Inc. 112 ,~oodnight Lane Tel. (972) 241-4517 ,"~ Rone ineers
Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-072 I Date of Observation 3/'04198 Report Date 04/13/98
To Western Rim Services
Location PAVING, FIRE LANE, EAST SIDE AT NORTHEAST CORNER OF BUILDING #39
Contractor
Supplier LATTIMORE I Plant 7 I Truck 573 Ticket 7047675
Time Sampled 9:00 Time Batched 7:41 Weather Condition CLOUDY
Concrete Temperature (°F) 64 Ambient Temperature (°F) 56 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.5
ENTRAINED AIR (%) 4.8
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days} (lbs.) Strength (psi) Strength Required (psi)
36A 7 3/11 70000 2480 3000/28 DAYS
B 28 4/01 100000 3540
C 28 4/01 114000 4030
D H
Curing Method J TestMethod I Standard 6" x12" I Engineer/-I'echnicianG. BEALL
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Kevin Tucker, ~'~ Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
{1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The tact results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, perfon~snce, etc.} or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they ara
addressed.
c:\wpwin~reports\D7429-O72-98\ST April 13, 1998