Loading...
Mansions Phase 1-LR 980413 (6) Rose Engineers, Inc. 1123~'"oodnight Lane Tel. (972) 241-4517 RoneEngineers Dallas/Fort Wortl~ Dallas. Texas Metro (972) 263-1555 W~ 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-071 I Date of Observation 3104/98 Report Date 04/13/98 To Western Rim Services Location PAVING, FIRE LANE, EAST SIDE OF SOUTHEAST CORNER OF BUILDING //7 Contractor Supplier LATTIMORE I Plant 3 I Truck 734 Ticket 3058396 I I Time Sampled 8:45 Time Batched 6:59 Weather Condition CLOUDY Concrete Temperature (°F) 60 Ambient Temperature (°F) 54 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data c226a4h lOe~]l~ ~&L SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 4.5 Concrete Cylinder Test(s) Specimen Age I Test Date J Total Load J Compressive No. (Days) {lbs.) Strength (psi) Strength Required (psi) 35A 7 3/11 83000 2940 3000/28 DAYS B 28 4/01 116000 4120 C 28 4/01 117000 4140 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician G. BEALL ASTM C 31J ASTM C 39 Area 28.27 sq. in. I Signature: Kevin Tucker, IN~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared baaed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters end reports are for the exclusive uae of the clients to whom they are addressed. c:~wpwin\reports\D7429-O71-98\ST April 13, 1998 Rone Engineers, Inc. 112 ~oodnight Lane : Tel. (972) 241-4517 ."~, Rone Sneers Dallas/Fed Wodh ' Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-070 I Date of Observation 3/04/98 Report Date 04/13/98 To Western Rim Services Location PAVING, FIRE LANE, WEST SIDE AT SOUTHWEST CORNER OF BUILDING //9 Contractor Supplier LATTIMORE J Plant 7 I Truck 752 Ticket 7047660 I I Time Sampled 7:50 Time Batched 5:54 Weather Condition CLOUDY Concrete Temperature I°F) 62 Ambient Temperature (°F) 54 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.75 ENTRAINED AIR (%) 4.6 Concrete Cylinder Test(s) Sl3ecimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 34A 7 3/11 65000 2300 3000/28 DAYS B 28 4/01 105000 3710 C 28 4/01 135000 4780 D H Curing Method I Test Method I Standard 6" x12" I Engineer/TechnicianG. BEALL ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letter, and reports are for the exclusive use of the clients to whom they are addressed. c:~.wpwin~reports~D7429-070-98~ST April 13, 1998