Loading...
Mansions Phase 1-LR 980408 (3) Rone Engineers, Inc. 234 Goodnight Lane Tel. (972) 241-4~./ RoneEn_ ineers Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-093 J Date of Observation 3/19/98 Report Date 04/08/98 I To Western Rim Services Location SOUTHWEST CORNER, 10' EAST BY 5' NORTH Contractor Supplier LATTIMORE I Plant 7 J Truck 574 Ticket 7048371 I I Time Sampled 10:10 Time Batched 10:00 Weather Condition CLOUDY Concrete Temperature (°F) 65 Ambient Temperature (°F) 56 Mix Number 38 Mix Description 5 SACKS W/R AIR Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5,0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs,) Strength (psi) Strength Required (psi) 50A 7 3/26 95000 3360 3000/28 DAYS B 28 4/16 129000 4560 C 28 4116 133000 4700 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician D. GODBEY ASTM C 31 I ASTM C 39 Area 28.27 sq. in. I Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition. appearance, perlormance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they ere addressed. c:\wpwin\reports\D7429-093-9e\ST April e. 199B r (/~