Loading...
Northlake 635(2)-CS 961114BROCKEI'TE- DAVIS' DRAKE,' ' Inc. consulting engineers November 14, 1996 Mr. Ken Griffin, P.E. City of Coppell 255 Parkway Blvd. Coppell, Texas 75019 RE: Lincoln Business Park Alternate Pavement Design Coppell, Texas BDD Project No. C96296 1-14-96 P03:40 IN Dear Mr. Griffin: We respectfully request that an alternate pavement section be allowed for the abe e referenced project. In lieu of lime stabilization, the pavement strength will be increased from 3500 to 4000 psi at 28 days (6" in truck dock and drive lanes, 5" in passenger car parking area). I have enclosed the soils report from Maxim Technologies for the project. Thei~ recommendation for moderate heavy truck parking is 6" 3500 psi concrete with lim subgrade. Their recommendation for automobile traffic is 5" 3000 psi concrete without lime-tre~ subgrade. If you have any questions please feel free to call. Sincerely, Project Engineer JWS/ds Enclosure (1) Geotechnical Investigation Civil & Structural Engineering · Surveying 4144 North Central Expressway, Suite II00 · Dallas, Texas 75204 (214) 824-3647 · Civil/Survey Fax (214) 824-7064 · Structural Fax (214) 824-2586