Northlake 635(2)-CS 961101 (2)Th 'y ' '
Tom Kuhlman
Lincoln Properties
500 North Akard/3300 Lincoln Plaza
Dallas, TX 75201
Replat of Lot 1, Block A, Northlake 635 Business Park (Lincoln B~
Development Fee Assessment
Dear Mr Kuhlman:
Enclosed is a copy of the City of Coppe!l Development Fee Assessment table, al
of the Development Fee calculations for the referenced development.
Please make payment to the City of Coppell in the amount of- $97,149.96 an(
Finance Department along with a copy of the Fee Assessment table. This arum
of the assessed fees which need to be paid prior to Council approval. Please re
table for additional fees. Also provide a copy of the Engineer's estimate or cot
so the construction inspection fee can be verified.
Providing a copy of your paid receipt to the Engineering Department will help
payment of required fees and insure a successful beginning of this project. We
to working with you on this project. If you have any questions, please contact
Sincerely,
AsSistant City"Manager/City
Engineer
CC:
Jennifer Armstrong, Finance Director
Doug Stevens, Engineering Technician
Matt Cast, Supt. of Public Services
Greg Jones, Chief Building Official
Gary Sims, Dir. Leisure Services
P.O. Box 478
CoppelI, Texas 75019
214-462-0022
~ovember 01, 1996
.ong with a copy
forward to the
nt is a portion
[er to attached
,tract to our office
s to verify the
>ok forward
DEVELOPMENT FEE TABLE
Project: Rcplat of Lot 1, Block A, NortMake 635 Business Park (Lincoln Busi,~ess Park)
Date: 11/1/96
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $15,525.00 $15,525.00
(100% due prior to Council Approval)
Water Tap Inspection Fee $300.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $587.94
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $5,357.78
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $90.00
(100% due at Issuance of Water Meter)
Irrigation/Fireline Meter Deposit $105.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $10,800.00 $10,800.00
(100% due prior to Council Approval)
Wastewater Tap Inspection Fee $150.00
(100% due at Issuance of Building Permi0
Utility Final Inspection Fee $150.00
(100% due at Issuance of Building Permit)
Park Fee $0.~00 $0.00
(100% due prior to Council Approval) ,
Roadway Impact Fee $70,824.96 $70,824.96
(100% due prior to Council Approval)
Street Light Fee Information not
(100% due prior to Acceptance of Project available at this time
Street Sign Fee Information not
(100% due prior to Acceptance of Project available at this time
Construction Inspection Fee Need submittal of
development contracts
TOTAL $103,890.68
TOTAL AMOUNT DUE PRIOR TO COUNCIL APPROVAL $97,149.96
DEVELOPMENT FEE WORKSHEET
PROJECT: Replat of Lot 1, Block A, Northlake 635 Business Park (Lincoln Bus
DATE: 11/1/96
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter{s):
Fireline Meter(s):
3 - 2 inch = 24
1 - 2 inch -- 8
2 - 8 inch = 2.5
Total #: 34.5 ESU's @ $450.00 ea.
{100% due prior to Council approval of the final plat)
Water Tap Inspection Fee:
Total #: 6 Connections @ $50.00 ea.
{Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Water Meter Fee (Domestic):
Total #: 3 Domestic Meter{s) @ $195.98
(Single family due prior to issuance of building permit)
{All other developments due prior to issuance of meter)
Water Meter Fee (Irrigation/Fireline):
Total #: 1 Irrigation Meter{s) @
Total #: 0 Additional Irrigation Meter{s) @
Total #: 2 Fireline Meter{s) @
{100% due prior to issuance of water meters)
$195.98
$2,580.90
Water Meter Deposit Fee (Domestic):
Total #: 3 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: 3 Meter(s) @ $35.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's
24
@ $450.00 ea.
Wastewater Tap Inspection Fee:
Total #: 3 Connections @ $50.00 ea.
{100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 3 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
Page 1
~ess Park)
ESU's
ESU's
ESU's
ESU's
$15,525.00
$300.00
$587.94
$195.98
$0.00
$5,161.80
$90.00
$105.00
$10,800.00
$150.00
'$150.00
DEVELOPMENT FEE WORKSHEET
Park Fee (For Resdential Developments Only):
* Preliminary plat approved prior to June 23, 1992:
N/A
N/A
Single-family @ $150.00 / Lot
Multi-family @ $75.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after June 23, 1992:
N/A
N/A
Single-family @ $350.00 / Lot
Multi-family @ $350.00 / Unit
(50% paid prior to Council approval of final plat)
(50% paid at issuance of building permit)
* Preliminary plat approved after October 26, 1993:
N/A
N/A
Single-family @ $1285.00 / Lot
Multi-family @ $1285.00 / Unit
(100% paid prior to Council approval of final plat)
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Page 2
N/A
N/A
N/A
N/A
N/A
N/A
$70,824.96
Information not
available at this time
Information not
available at this time
Need submittal of
development contracts
PROJECT:
DATE:
ROADWAY IMPACT FEE CALCULATIONS
Replat of Lot 1, Block A, Northlkae 635 Business Park (Lincoln Busine
11/1/96
ROADWAY IMPACT FEE:
Service Area *
Categor~ **
Land Use **
Building Size (sq. Ft.)
Development Units **
Vehicle Miles per Development Unit **
Fee per Vehicle Mile ***
Roadway Impact Fee due = (Development Units) x
iVehicle Miles Per Development Unit) x (Fee Per Vehicle Mile) --
I0
Indust
General Light
Park)
rial
:Industrial
222,'~ 20
$30(
* (Figure 2 - Roadway Impact
** (Table 3 - Roadway Impact
*** (Schedule 2, Page 3 - Roadv
$70,824.96
Fee Study)
ee Study)
ay Impact Fee Study)
This fee is eligible for up to a 50% credit due to the o
developer constructing Lakeshore & Crestside Drives.
To be eligible for this credit, a letter from the original
needs to be submitted assigning some of the credits to
development.
riginal
developer
this