Loading...
Mansions Phase 1-LR 980402 (11) Rone Engineers, Inc. ', _34 Goodnight Lane Tel. (972) 241-45. RoneEngineers Dal~as/Forl Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-095 Date of Observation 3/20/98 Report Date 04/02/98 To Western Rim Services Location BUILDING //27 - NORTHWEST CORNER, 12' EAST, 3' SOUTH Contractor EDWARDS CONSTRUCTION Supplier LATTIMORE I Plant 7 I Truck 786 Ticket 7048400 Time Sampled 7:30 Time Batched 7:20 Weather Condition CLOUDY Concrete Temperature (°F) 52 Ambient Temperature {°F) 43 Mix Number 14 Mix Description 4.50 SACKS W/R Unit Weight Water Added 30 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 5 lA 7 3/27 77000 2720 3000/28 DAYS B 28 4/17 C 28 4/1 7 D H Curing Method Test Method /Standard 6" x 12" I Engineer/Technician D. GODBEY ASTM C 31// I ASTM C 39~.Area 28.27 SCl. in. I Signature: ,.~ Mike Fuller,~;J~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin&reports~D7429-O95-98\ST April 2, 1998