Mansions Phase 1-LR 980402 (12) Rone Engineers, Inc. 1 . ~34 Goodnight Lane Tel. (972) 241-453, ineers
Dallas/For1 Worlh Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-096 I Date of Observation 3/20/98 Report Date 04/02/98
I
To Western Rim Services
Location BUILDING //27 - SOUTHEAST CORNER, 20' NORTH, 15' WEST
Contractor EDWARDS CONCRETE
Supplier LATTIMORE I Plant 7 I Truck 460 Ticket 7048408
I
I
Time Sampled 8:10 Time Batched 8:00 Weather Condition CLOUDY
Concrete Temperature {°F) 52 Ambient Temperature (°F) 43 Mix Number 14
Mix Description 4.50 SACKS Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP {in.) --
ENTRAINED AIR {%) --
Concrete Cylinder Test(s)
No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi)
52A 7 3/27 71000 2510 3000/28 DAYS
B 28 4/17
C 28 4/17
D H
Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician D. GODBEY
ASTMC31 I ASTMC39 I Area 28.27 sq. in.
I
Signature: /../~Mike Fuller,/~j~ Supervisor, CMT
Remarks an~]/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality Jcomposition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have nc control. Our letters end reports ere for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O96-9B~ST April 2, 1998