Loading...
Mansions Phase 1-LR 980402 (12) Rone Engineers, Inc. 1 . ~34 Goodnight Lane Tel. (972) 241-453, ineers Dallas/For1 Worlh Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-096 I Date of Observation 3/20/98 Report Date 04/02/98 I To Western Rim Services Location BUILDING //27 - SOUTHEAST CORNER, 20' NORTH, 15' WEST Contractor EDWARDS CONCRETE Supplier LATTIMORE I Plant 7 I Truck 460 Ticket 7048408 I I Time Sampled 8:10 Time Batched 8:00 Weather Condition CLOUDY Concrete Temperature {°F) 52 Ambient Temperature (°F) 43 Mix Number 14 Mix Description 4.50 SACKS Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP {in.) -- ENTRAINED AIR {%) -- Concrete Cylinder Test(s) No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 52A 7 3/27 71000 2510 3000/28 DAYS B 28 4/17 C 28 4/17 D H Curing Method I Test Method I Standard 6" x 12" I Engineer/Technician D. GODBEY ASTMC31 I ASTMC39 I Area 28.27 sq. in. I Signature: /../~Mike Fuller,/~j~ Supervisor, CMT Remarks an~]/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality Jcomposition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have nc control. Our letters end reports ere for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O96-9B~ST April 2, 1998