Mansions Phase 1-LR 980402 (13) Rone Engineers, Inc. 1, .34 Goodnight Lane Tel. (972) 241-45'~, RoneEn lineers
Dallas/Fort Worm Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-097 I Date of Observation 3/20~98 Report Date 04/02/98
I
To Western Rim Services
Location BUILDING 44 - SOUTHWEST END, 5' EAST, 50' SOUTH
Contractor EDWARDS CONSTRUCTION
Supplier LATTIMORE I Plant 7 I Truck 755 Ticket 7048428
I
I
Time Sampled 10:50 Time Batched 10:40 Weather Condition CLOUDY
Concrete Temperature (°F) 60 Ambient Temperature (°F) 54 Mix Number 14
Mix Description 4.50 SACKS W/R Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6.0
Concrete Cylinder Test(s)
I IT°tal L°ad C°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
53A 7 3/27 89000 31 50 3000/28 DAYS
B 28 4/1 7
C 28 4/1 7
D H
Method I Test Method Standard 6" x 12"I Engineer/Technician D. GODBEY
Curing
ASTM C 31 - I ASTM C 39 ,,--yArea 28.27 sq. in. I
Signature: /t Mike Fuller, ~('/Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject maker provided by
persons or conditions over which we have no control. Our letters end reports ere for the exclusive use of the clients to whom they are
addresaed.
c:~wpwin\reports\D7429-O97-9e\ST April 2, 1998