Loading...
Mansions Phase 1-LR 980402 (15) Dal,as/Fon Worm Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-102 I Date of Observation 3/23/98 Report Date 04/02/98 I To Western Rim Services Location CLUB CIRCLE, NORTH END,'10' WEST, 3' SOUTH Contractor PRO-CRETE CONSTRUCTION Supplier BUTLER I Plant 1 I Truck 71 Ticket Time Sampled 9:10 Time Batched 9:00 Weather Condition CLEAR Concrete Temperature {°F) 50 Ambient Temperature (°F) Mix Number Mix Description Unit Weight Water Added 20 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.0 Concrete Cylinder Test(s) I I T°ta' L°ad [c°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 55A 7 3/30 101 000 3570 3000/28 DAYS B 28 4/20 C 28 4/20 D H Method I Test Method I Standard 6" x 12" Engineer/Technician D. GODBEY Curing ASTM C 31 . I ASTM C 39 .J~Area 28.27 sq. in. Signature:_~Mike Fuller,,~S~Supervisor, CMT Remarks and/or Distribution Distribution: {1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented heroin were prepared baaed upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which wa have no control. Our letters and reports are for the exclusive use of the clients to whom thev are addressed. c:\wpwin\reports\D7429-102-98\ST April 2, 1998