Mansions Phase 1-LR 980402 (15) Dal,as/Fon Worm Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-102 I Date of Observation 3/23/98 Report Date 04/02/98
I
To Western Rim Services
Location CLUB CIRCLE, NORTH END,'10' WEST, 3' SOUTH
Contractor PRO-CRETE CONSTRUCTION
Supplier BUTLER I Plant 1 I Truck 71 Ticket
Time Sampled 9:10 Time Batched 9:00 Weather Condition CLEAR
Concrete Temperature {°F) 50 Ambient Temperature (°F) Mix Number
Mix Description Unit Weight Water Added 20 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.0
Concrete Cylinder Test(s)
I I T°ta' L°ad [c°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
55A 7 3/30 101 000 3570 3000/28 DAYS
B 28 4/20
C 28 4/20
D H
Method I Test Method I Standard 6" x 12" Engineer/Technician D. GODBEY
Curing
ASTM C 31 . I ASTM C 39 .J~Area 28.27 sq. in.
Signature:_~Mike Fuller,,~S~Supervisor, CMT
Remarks and/or Distribution
Distribution:
{1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented heroin were prepared baaed upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which wa have no control. Our letters and reports are for the exclusive use of the clients to whom thev are
addressed.
c:\wpwin\reports\D7429-102-98\ST April 2, 1998