Mansions Phase 1-LR 980402 (19) Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555
:, 75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-107 I Date of Observation 3/24/98 Report Date 04/02/98
I
To Western Rim Services
Location BUILDING 44, SOUTHEAST END, 15' NORTH
Contractor EDWARDS CONSTRUCTION
Supplier LATTIMORE Plant 6 I Truck 804 Ticket 6068711
Time Sampled 10:15 Time Batched 10:00 Weather Condition CLEAR
Concrete Temperature (°F) 65 Ambient Temperature (°F) 70 Mix Number 14
Mix Description 4.50 SACKS Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
Concrete Cylinder Test(s)
J J Tota, Load Compressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
59A 7 3/31 74000 2620 3000/28 DAYS
B 28 4/21
C 28 4/21
D H
Curing Method J Test Method Standard 6" x 12"
I
Engineer/Technician
D.
GODBEY
ASTMC31 , J ASTMC39 _ Area 28.27 sq. in. J
Signature: ~-~-Mike Fuller,~ Supervisor, CMT
Remarks ar~d/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for vadation in quality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters end reports ara for the exclusive use of the clients to whom they are
addreesed.
c:\wpwin\reports\D7429-107-98~,ST April 2, 199e