Mansions Phase 1-LR 980401 Rone Engineers, Inc. 3. _34 Goodnight Lane : Tel. (972) 241-45,. RoneEn ineers
Dallas/Foe, Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
-Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-092A I Date of Observation 3/19/98 Report Date 04/01/98
To Western Rim Services
Location SLAB 4, SOUTHEAST CORNER, 8' WEST BY 1' NORTH
Contractor
Supplier LATTIMORE I Plant 7 I Truck 468 Ticket 7048362
I
I
Time Sampled 9:10 Time Batched 9:00 Weather Condition CLOUDY
Concrete Temperature (°F) 63 Ambient Temperature (°F} 56 Mix Number
Mix Description 5 SACKS W/R AIR Unit Weight Water Added 10 GALLONS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 3.0
Concrete Cylinder Test(s)
I I IT°tal L°ad C°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength {psi) Strength Required (psi)
49A 7 3/26 103000 3640 3000/28 DAYS
B 28 4/16
C 28 4/16
D H
Curing Method I Test Method I Standard
I
6"
X
1
2"
Engineer/Technician
D.
GODBEY
ASTMC31 - I ASTMC39 LArea 28.27 sq. in. I
Signature: ~ZMike Fuller,//~/Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We allume no
responsibility for variation in quality (compolition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters end reports are for the exclusive use of the clients to whom they are
addressed.
c:~wpwin~reports\D7429-O92A-98\ST April 1, 1998