Mansions Phase 1-LR 980401 (5)Rone Engineers, Inc. '~ 34 Goodnight Lane Tel. (972) 241-45 RoneEnlineers
Dallas/Fort Worth Dallas, lexas Metro (972) 263-1555
75229 Fax (972) 241-5174
GENERAL REPORT
PROJECT: Mansion By The Lake
REPORT NO: 3137-D7429-120 REPORT DATE: April 1, 1998
CLIENT: Western Rim Services SAMPLE DATE: March 31, 1998
REPORT OF: CANCELLATION
On March 31, 1998, D'metrius Godbey, representing Rone Engineers, Inc., arrived on site
at the above referenced project to perform Concrete Inspection services. Upon arrival, the
technician was informed that this day's activities were cancelled due to min.
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific sarnples provided for tesling. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reporls are for lhe exclusive use of the clients to whom they are addressed.
¢:~.~s4n~n~)7429-12~-~ST Al~il I, 19~8