Loading...
Mansions Phase 1-LR 980401 (5)Rone Engineers, Inc. '~ 34 Goodnight Lane Tel. (972) 241-45 RoneEnlineers Dallas/Fort Worth Dallas, lexas Metro (972) 263-1555 75229 Fax (972) 241-5174 GENERAL REPORT PROJECT: Mansion By The Lake REPORT NO: 3137-D7429-120 REPORT DATE: April 1, 1998 CLIENT: Western Rim Services SAMPLE DATE: March 31, 1998 REPORT OF: CANCELLATION On March 31, 1998, D'metrius Godbey, representing Rone Engineers, Inc., arrived on site at the above referenced project to perform Concrete Inspection services. Upon arrival, the technician was informed that this day's activities were cancelled due to min. Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific sarnples provided for tesling. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reporls are for lhe exclusive use of the clients to whom they are addressed. ¢:~.~s4n~n~)7429-12~-~ST Al~il I, 19~8