Loading...
Mansions Phase 1-LR 980331 (4) Rone Engineers, Inc. 1,,.34 Goodnight Lane Tel. (972) 241-453, RoneEngineers Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-042 I Date of Observation 2/25/98 Report Date 03/31/98 I To Western Rim Services Location PAVING, NORTH OF PAD //25, 20' NORTH, 30' EAST FROM NORTHWEST CORNER FOR PAD SITE //25 Contractor Supplier LATTIMORE Plant 7 I Truck 610 Ticket 7047253 I Time Sampled 6:15 Time Batched 5:39 Weather Condition CLOUDY · Concrete Temperature (°F) 74 Ambient Temperature (°F) 54 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 5.5 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) {lbs.) Strength (psi) Strength Required (psi) 13A 3 2./27 83000 2940 3500/28 DAYS B 28 3/25 140000 4950 C 28 3/25 140000 4950 D H ASTM C 3~1 I ASTM C ~_9.. 28.27 in. Signature: ike Fuller,/~¢~]' Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D, Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters end reporta are for the exclusive use of the clients to whom they are addressed. c:\wpwin\repor~s\D7429-O42-98',.ST March 31, 1998 Dallas/Forl Worln Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-043 Date of Observation 2/25/98 Report Date 03/31/98 To Western Rim Services Location PAVING, NORTH OF PAD #27, 20' NORTH, 30' EAST FROM NORTHWEST CORNER OF PAD SITE #27 Contractor Supplier LATTIMORE IPlant7 ITruck786 Ticket 7047258 Time Sampled Time Batched Weather Condition CLOUDY Concrete Temperature (°F) 74 Ambient Temperature (°F) 55 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 5.4 Concrete Cylinder Test(s) I I JT°talL°adl C°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 14A 7 3/04 98000 3470 3500/28 DAYS B 28 3/25 128000 4530 C 28 3/25 133000 4700 D H Curing Method I TestMethod I Standard 6" x12" I EngineerfTechnicianR. LOVELADY ASTM C 3~~,,~.. I ASTM C~ Area 28.27 sq. in. Signature:j/n~lKe Fuller,~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein ware prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters end reports ara for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O43-95\ST March 31, 1998 Rone Engineers, Inc. 1 , ~34 Goodnight Lane Tel. (972) 241-45'~. ineers Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-044 I Date of Observation 2/25/98 Report Date 03/31/98 To Western Rim Services t Location PAVING, NORTH OF PAD #28, 15' NORTH, 10' EAST FROM NORTHEAST CORNER OF PAD SITE //28 Contractor Supplier LATTIMORE I Plant3 I Truck 450 Ticket 3057959 Time Sampled 9:00 Time Batched 8:15 Weather Condition CLOUDY Concrete Temperature (°F) 70 Ambient Temperature (°F) 55 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 5.7 Concrete Cylinder Test(s) I I IT°tal L°ad C°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 15A 7 3/04 108000 3820 3500/28 DAYS B 28 3/25 137000 4850 C 28 3/25 140000 4950 D H CuringMeth°d I TestMeth°d J Standard 6" x12" I Engineer/TechnicianR'LOVELADYArea sq. ASTM C 3~1_ I ASTM C~. 28.27 in. Signature ike Fuller, z~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O44-98\ST March 31, 1998 Defies/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-045 I Date of Observation 2/25/98 Report Date 03/31/98 I To Western Rim Services Location PAVING, EAST SIDE PAD //2.8, 75' SOUTH, 15' EAST FROM NORTHEAST CORNER OF PAD SITE #28 Contractor Supplier LATTIMORE I Plant 6 I Truck 454 Ticket 6066978 I I Time Sampled 10:00 Time Batched 10:45 Weather Condition CLOUDY Concrete Temperature (°F) 72 Ambient Temperature (°F) 56 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 5.5 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 16A 7 3/04 103500 3660 3500/28 DAYS B 28 3/25 130000 4600 C 28 3/25 128000 4530 D H CuringMeth°d I TestMeth°d I Standard 6" x12" I Engineer/TechnicianR'LOVELADYArea sq. ASTM C 3~..... I in. ASTM C~/ 28.27 Signature~ Mike Fuller, ~//j~/ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our lettem end reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O45-98\ST March 31, 1998 ; Rone Engineers, Inc. ,. ?34 Goodnight Lane Tel. (972) 241-45,, ineers Dallas/Fort Worth Dallas1 Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-046 I Date of Observation 2/25/98 Report Date 03/31/98 I To Western Rim Services Location PAVING, NORTH OF PAD //28, 14§' EAST, 10' NORTH FROM NORTHEAST CORNER OF PAD SITE//28 Contractor Supplier LATTIMORE Plant 7 I Truck 573 Ticket 7047289 Time Sampled 12:05 Time Batched 11:20 Weather Condition PT CLOUDY Concrete Temperature (°F) 75 Ambient Temperature (°F) 56 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 5.7 Concrete Cylinder Test(s) I I IT°tal L°ad compressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 17A 7 3/04 96000 3400 3500/28 DAYS B 28 3/25 125000 4420 C 28 3/25 117000 4140 D H Curing Method J Test Method I Standard 6" x 12" I Engineer/Technician R. LOVELADY Area sq. ASTM C 3~ IASTM C 26.27 I Signature:J Mike Fuller, ~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C, D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O46-98\ST March 31, 1998 Rone Engineers, Inc. _34 Goodnight Lane Tel. (972) 241-45,. RoneEngineers Dallas/For[ Wortl~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-047 I Date of Observation 2/25/98 Report Date 03/31/98 I To Western Rim Services Location PAVING, EAST SIDE PAD #44, 60' NORTH, 10' EAST FROM SOUTHEAST CORNER OF PAD SITE #44 Contractor Supplier LATTIMORE I Plant 3 I Truck 898 Ticket 3058008 I I Time Sampled 1:15 Time Batched 12:47 Weather Condition PT CLOUDY Concrete Temperature (°F) 75 Ambient Temperature {°F) 58 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 1/2 ENTRAINED AIR (%) 5.2 Concrete Cylinder Test(s) I [ I T°tal L°ad Icompressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 18A 7 3/04 105000 3710 3500/28 DAYS B 28 3/25 141000 4990 C 28 3/25 138000 4880 D H ASTM C 3' ASTM C.~? 28.27 in. Signature: "'~ike Fuller, ~ Supervisor, CMT Remarks arnd/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {composition. appearance, performance, etc.} or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O47-98\ST March 31, 1998 Rone Engineers, Inc. , _~34 Goodnight Lane Tel. (972)241-45,. RoneEn_qineers Dallas.,Fort Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-048 I Date of Observation 2/25198 Report Date 03/31/98 To Western Rim Services Location PAVING SOUTH OF LOT #7, 20' SOUTH, 5' WEST FROM SOUTHWEST CORNER OF LOT //7 Contractor Supplier LATTIMORE J Plant 6 I Truck 808 Ticket 6067013 I I Time Sampled 2:45 Time Batched 1:15 Weather Condition PT CLOUDY Concrete Temperature (°F) 77 Ambient Temperature (°F) 62 Mix Number 40 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 5.6 Concrete Cylinder Test(s) I I IT°tal L°ad Compressive Specimen Age Test Date No. (Days) {lbs.) Strength {psi) Strength Required (psi) 19A 7 3/04 101000 3570 3500/28 DAYS B 28 3/25 124000 4390 C 28 3/25 123000 4350 D H CuringMeth°d I TestMeth°d I Standard 6" x12" I Engineer/TechnicianR'LOVELADYArea sq. ASTM C 3,~ I ASTM C~9 28.27 in. Signaturet IMike Fuller,~,~ Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality Icomposltion, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive usa of the clients to whom they ara addressed. c:\wpwin\reports\D7429-O48-98\ST March 31, 1998