Loading...
Mansions Phase 1-LR 980331 (5) Da,la$/Forl Worlr~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 1 of 4 Report No: 3137-D7429-112 Sample Date: March 24, 1998 Client: Western Rim Services Report Date: March 31, 1998 Location: Building//4 Technician: Rusty Crowder // Tendon Location lack Force Gauge Required Elongations Elongations Total Within No. (l(Jps) Pressure Elongations End (1) Emi (2) Elongations Tolerance I B-29 EAST SIDE 33K 7800 2 1/8 2 1/8 YES 2 S-29 EAST SIDE 33K 7800 2 I/8 2 1/8 YES 3 S--48 EAST SIDE 33K 7800 3 5/8 3 7/8 YES 4 B-30 EAST SIDE 33K 7800 2 2/8 2 3/16 YES 5 B-30 EAST SIDE 33K 7800 2 2/8 2 2/8 YES 6 B-30 EAST SIDE 33K 7800 2 2/8 2 1/8 YES 7 B-30 EAST SIDE 33K 7800 2 ~8 2 2/8 YES 8 B-57 EAST SIDE 33K 7800 4 3/8 4 3/8 YES 9 S-57 EAST SIDE 33K 7800 4 3/8 4 1/2 YES I0 B-78 EAST SIDE 33K 7800 6 5 1/2 YES 11 S-63 SOUTH SIDE 33K 7800 4 7/8 4 5/8 YES 12 S-62 SOUTH SIDE 33K 7800 4 3/4 4 3/4 YES i:3 B-62 SOUTH SIDE 33K 7800 4 3/4 4 3/4 YES 14 S-62 SOUTH SIDE 33K 7800 4 3/4 4 7/8 YES 15 S-62 SOUTH SIDE 33K 7800 4 3/4 4 7/8 YES 16 S-65 SOUTH SIDE 33K 7800 5 5 YES 17 B-65 SOUTH SIDE 33K 7800 5 5 YES 18 S-65 SOUTH SIDE 33K 7800 5 5 YES 19 S-61 SOUTH SIDE 33K 7800 4 5/8 4 3/4 YES Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon thc specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or eondltions over which we have no control. Our letters and reporls are for th,' exclusive use offthe clients to whom they are addressed. ~'~ c:\wpwin\reporls\D7429-112-98\ST April 8, 1998 Rone Engineers. Inc. 11~''~ Goodnight Lane : Tel. (972) 241-4517'-" RoneEncfineers Dallas/Fort Worth Dallas. Texas Metro (972) 263-1555 il 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 2 of 4 Report No: 3137-D7429-1 12 Sample Date: March 24, 1998 Client: Western Rim Services Report Date: March 31, 1998 Location: Building #4 Technician: Rusty Crowder # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 20 S-61 SOUTH SIDE 33K 7800 4 5/8 4 3/4 YES 21 B-64 SOUTH SIDE 33K 7800 4 7/8 5 YES 22 S-64 SOUTH SIDE 33K 7800 4 7/8 5 1/8 YES 23 S-64 SOUTH SIDE 33K 7800 4 7/8 5 1/8 YES 24 S-62 SOUTH SIDE 33K 7800 4 3/4 5 1/4 YES 25 S-64 SOUTH SIDE 3BK 7800 4 7/8 5 1/8 YES 26 B-64 SOUTH SIDE 33K 7800 4 7/8 5 1/4 YES 27 S-62 SOUTH SIDE 33K 7800 4 314 5 1/4 YES 28 S-62 SOUTH SIDE 33K 7800 4:3/4 4 3/4 YES 29 B-69 SOUTH SIDE 33K 7800 5 I/4 4 3/4 YES :30 S--69 SOUTH SIDE 33K 7800 5 1/4 5 1/2 YES 31 S-69 SOUTH SIDE 33K 7800 5 I/4 5 1/2 YES 32 S-69 SOUTH SIDE 33K 7800 5 1/4 5 3/8 YES 33 B-69 SOUTH SIDE 3BK 7800 5 I/4 5 3/8 YES :34 S-69 SOUTH SIDE 3:3K 7800 5 1/4 5 5/8 YES :35 S-69 SOUTH SIDE :3:3K 7800 5 1/4 5 1/16 YES 36 S-69 SOUTH SIDE 33K 7800 5 1/4 5 1/8 YES 37 S-61 SOUTH SIDE 33K 7800 4 5/8 4 5/8 YES :38 B-:32 SOUTH SIDE 3:3K 7800 2 3/8 2 1/8 YES Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (i) Mr. Lee Stone; City of Coppell (i) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMrrATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. ¢:\wpwin\reports\D7429-112-98\ST April 8, 1998 ; Rone Engineers, Inc. : 1 l'~'t Goodnight Lane Tel. (972) 241-451 .-"-" ineers Dallas/Eon Wort~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 3 of 4 Report No: 3137-D7429-112 Sample Date: March 24, 1998 Cliem: Western Rim Services Report Date: March 31, 1998 Location: Building #4 Technician: Rusty Crowder # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. ('Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 39 5-32 SOUTH SIDE 33K 7800 2 3/8 2 I~ YES 40 5-61 WEST SIDE 33K 7800 4 5/8 4 3/4 YE~ 41 B-61 WEST SIDE 33K 7800 4 5/8 4 3/4 YES 42 S-70 WEST SIDE 33K 7800 5 3/8 5 1/2 YES 43 5-98 WE3T SIDE 33K 7800 7 518 7 1/2 YES 44 S-101 WF..ST SIDE 33K 7800 7 7/8 8 3/8 YES 45 S-101 WF, ST SIDE 33K 7800 7 7/8 8 YES 46 B-75 WEST SIDE 33K 7800 5 3/4 5 1/2 YES 47 S-102 WEST SIDE 33K 7800 7 7/8 8 1/4 YES 48 5-102 WEST SIDE 33K 7800 7 7/8 8 1/2 YES 49 5-102 WE, ST SIDE 33K 7800 7 7/8 8 5/8 YES 50 B-76 WEST SIDE 33K 7800 5 7/8 5 3/4 YES 51 5-98 WEST SIDE 33K 7800 7 5/8 7 3/4 YES 52 S-98 WEST SIDE 33K 7800 7 5/8 7 7/8 YES 53 S-98 WEST SIDE 33K 7800 7 5/8 7 3/4 YES 54 S-98 WEST SIDE 33K 7800 7 5i8 8 YES 55 S-101 WEST SIDE 33K 7800 7 7/8 7 1/2 YES 56 B-74 WF_3T SIDE 33K 7800 5 3/4 5 3/4 YES 57 5-101 WEST SIDE 33K 7800 7 7/8 8 1/8 YES t:quipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Distribution: (I) Mr. Richard E. Simmons; We, stem Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject [nauer provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive uso of the clients to whom they are addressed. c:\wpwin\reports\D7429-112-98\ST April 8, 1998 R°ne Engineers'lnc' ' l~"-"t G°°anlgntLane ' Tel' [972) 24'~-45'~-"~'~ Ro E n Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 4 of 4 Report No: 3137-D7429-112 Sample Date: March 24, 1998 Client: Western Rim Services Report Date: March 31, 1998 Location: Building #4 Technician: Rusty Crowder # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pr~ssur~ Elongations End (1) F. ad (2) Elongations Tolerance 58 S-101 WF_.~T SIDE 33K 7800 7 7/8 8 1/4 YES 59 S-101 WEST SIDE 33K 7800 7 7/8 8 YES 60 B-79 WEST SIDE 33K 7800 6 1/8 6 I/4 YES 61 S-15 WEST SIDE 33K 7800 I 15/16 YES 62 S-27 WEST SIDE 33K 7800 2 2 YES 63 S-27 WEST SIDE 33K 7800 2 2 YES 64 B-27 WEST SIDE 33K 7800 2 1 7/8 YES Equipment ID: Ram No: Pump No: Gauge No: Equipment Calibration Date: Comments: Distribution: (1) Mr. Richard E. Simmons; Western Rim Sen'ices (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-112-98\ST April 8, 1998