Loading...
Mansions Phase 1-LR 980326 (2) Acne Engineers, Inc. 11'~ Goodnight Lane Tel. (972) 241-4517~-'' RoneEnglineer Dallas/For~ Wo~h Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-082 I Date of Observation 3/12/98 Report Date 03/26/98 I To Western Rim Services Location BUILDING 25, SLAB, THE TOP PART OF SLAB AND BACK LEFT CORNER Contractor Supplier LATTIMORE Plant 7 I Truck 458 Ticket 7048104 I Time Sampled 8:40 Time Batched 8:30 Weather Condition CLEAR Concrete Temperature {°F) 50 Ambient Temperature (°F) 39 Mix Number Mix Description 5 SACKS W/R AIR Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 7.0 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 43A 7 3/19 107000 3780 3000/28 DAYS B 28 4/09 C 28 4/O9 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Mike Fuller, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic {1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results preaented herein were prepared baaed upon the specific samplea provided for tearing. We assume no responsibility for variation in quality (compoaition, appearance, performance, etc.) er any other feature of similar subject matter provided by peraona or conditiona over which we have no control. Our letters and reporta are for the exclusive uae of the clienta to whom they are addressed. c:\wpwin\reports\D7429-O82-98\ST March 26, 1998 ~