Mansions Phase 1-LR 980323 (2) ' Rone Engineers, Inc. 11 Gooc~n,gl~t Lane Tel. 24 RoneEnqineers
Dal~as/Forl Wortr~ Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansion By The Lake Page 4 of 4
Report No: 3137-D7429-092 Sample Date: March 18, 1998
Client: Western Rim Services Report Date: March 23, 1998
Location: Building #25 Technician: Tim Duke
# Tendon Location Jack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance
58 S-101 EAST SIDE 33K 7800 7 7/8 7 1/4 YES
59 S-101 EAST SIDE 33K 7800 7 7/8 7 YES
60 B-79 EAST SIDE 33K 7800 6 1/8 6 YES
61 S-15 EAST SIDE 33K 7800 I 3/4 YES
62 S-27 EAST SIDE 33K 7800 2 I 3/4 YES
63 S-27 EAST SIDE 33K 7800 2 I 7/8 YES
64 B-27 EAST SIDE 33K 7800 2 I 3/4 YES
~quipment ID: Ram No: 38077 Pump No: 380005 Gauge No: 38077
Equipment Calibration Date: 5/13/97
Comments:
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMrrATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-092-98\ST March 23, 1998