Loading...
Mansions Phase 1-LR 980323 (2) ' Rone Engineers, Inc. 11 Gooc~n,gl~t Lane Tel. 24 RoneEnqineers Dal~as/Forl Wortr~ Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 ELONGATION REPORT Project: Mansion By The Lake Page 4 of 4 Report No: 3137-D7429-092 Sample Date: March 18, 1998 Client: Western Rim Services Report Date: March 23, 1998 Location: Building #25 Technician: Tim Duke # Tendon Location Jack Force Gauge Required Elongations Elongations Total Within No. (Kips) Pressure Elongations End (1) End (2) Elongations Tolerance 58 S-101 EAST SIDE 33K 7800 7 7/8 7 1/4 YES 59 S-101 EAST SIDE 33K 7800 7 7/8 7 YES 60 B-79 EAST SIDE 33K 7800 6 1/8 6 YES 61 S-15 EAST SIDE 33K 7800 I 3/4 YES 62 S-27 EAST SIDE 33K 7800 2 I 3/4 YES 63 S-27 EAST SIDE 33K 7800 2 I 7/8 YES 64 B-27 EAST SIDE 33K 7800 2 I 3/4 YES ~quipment ID: Ram No: 38077 Pump No: 380005 Gauge No: 38077 Equipment Calibration Date: 5/13/97 Comments: Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMrrATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-092-98\ST March 23, 1998