Mansions Phase 1-LR 980323 (3) ,,,...... Inc. Goodnight Lane .. Tel. (972) 241.45 z ' RoneEngineers
Oa~,a~,'Fon wo~r~ Dallas. Texas . Metro (972/ 263-'15~b
75229 Fax (972) 241-5174
ELONGATION REPORT
Project: Mansion By The Lake Page 4 of 4
Report No: 3137-D7429-092 Sample Date: March 18, 1998
Client: Western Rim Services Report Date: March 23, 1998
Location: Building//26 Technician: Tim Duke
# Tendon Location /ack Force Gauge Required Elongations Elongations Total Within
No. (Kips) Presaure Elongations End (I) End (2) Elongations Tolerance
58 S-101 WEST SIDE 33K 7800 7 1/4 7 1/2 YES
59 $-101 WEST SIDE 33K 7800 7 7 1/2 YES
60 B-79 WEST SIDE 33K 7800 6 6 YES
61 S-15 WEST SIDE 33K 7800 3/4 3/4 YF_3
62 S-27 WEST SID£ 33K 7800 I 3/4 1 7/8 YES
63 S-27 WEST SIDE 33K 7800 I 7/8 1 7/8 YES
64 B-27 WEST SIDE 33K 7800 I 3/4 I 1/2 YES
~quipment ID: Ram No: 38077 Pump No: 380005 Gauge No: 38077
Equipment Calibration Date: 5/13/97
Comments:
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(I) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: Thc test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom lhey are
addressed.
c:\wpwln\reports\D7429-092-98\ST March 23, 1998