Loading...
Mansions Phase 1-LR 980320 ; Dallas~Fort Worth Dallas. Texas I Metro (972) 263-1555 ~ 75229 , Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-072 I Date of Observation 3/04/98 Report Date 03/20/98 I To Western Rim Services Location PAVING, FIRE LANE, EAST SIDE AT NORTHEAST CORNER OF BUILDING #39 Contractor I I Time Sampled 9:00 Time Batched 7:41 Weather Condition CLOUDY Concrete Temperature (°F) 64 Ambient Temperature {°F} 56 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.5 ENTRAINED AIR (%) 4.8 Concrete Cylinder Test(s) I I IT°tal L°ad C°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 36A 7 3/11 70000 2480 3000/28 DAYS B 28 4/01 C 28 4/01 D H Curing Method I Test Method I Standard 6" x12" I Engineer/TechnicianG. BEALL ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samplea provided for testing. We assume no responsibility for variation in quality (compoeition, appearance, performance, etc.) or any other feature of eimilar subject matter provided by persons or conditions over which we have no control. Our lettare and reporta ere for the exclusive use of the clients to whom they are addressed. c:\wpwin\repo~s\D7429-O72-ge\ST March 20, 1998 -~