Loading...
Mansions Phase 1-LR 980316 Rone Engineers, Inc. 1'~ 234 Goodnight Lane Tel. (972) 241-45'1. RoneEn ineers Dal~as.'Fo~ Wo~h Dallas, Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-071 I Date of Observation 3/04/98 Report Date 03/16/98 I To Western Rim Services Location PAVING, FIRE LANE, EAST SIDE OF SOUTHEAST CORNER OF BUILDING #7 Contractor Supplier LATTIMORE I Plant 3 I Truck 734 Ticket 3058396 I I Time Sampled 8:45 Time Batched 6:59 Weather Condition CLOUDY Concrete Temperature (°F) 60 Ambient Temperature (°F) 54 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL S PECIFI CATI ON S SLUMP (in.) 5.0 ENTRAINED AIR (%) 4.5 Concrete Cylinder Test(s) SpecimenI Age I Test Date l Total Load l Compressive No. (Days) (lbs.) Strength (psi) Strength Required (psi) 35A 7 3/11 83000 2940 3000/28 DAYS B 28 4/01 C 28 4/01 D H ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The teat results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality Icompoeltion, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O?l-98\ST March 16, 1998