Mansions Phase 1-LR 980316 (2) Rone Engineers, Inc. 11234 Goodnight Lane Tel. (972) 241-451. ineers
Dallas/For1 Worlh Dallas. Texas ~ Metro (972) 263-1555
75229 , Fax (972} 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-073 I Date of Observation 3/04/98 Report Date 03/16/98
I
To Western Rim Services
Location PAVING, FIRE LANE, SOUTH SIDE AT SOUTHEAST CORNER OF BUILDING #39
Contractor
Supplier LATTIMORE I Plant 3 I Truck 756 Ticket 3058416
Time Sampled 10:10 Time Batched 9:22 Weather Condition PT CLOUDY
Concrete Temperature (°F) 62 Ambient Temperature (°F) 60 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 4.5
ENTRAINED AIR {%) 4.5
Concrete Cylinder Test(s)
] I T°tal L°ad IC°mpressive
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
37A 7 3/11 90000 3180 3000/28 DAYS
B 28 4/01
C 28 4/01
D H
Curing Method ] Test Method Standard 6" x 12" I Engineer/Technician G. BEALL
ASTM C 31I ASTM C 39 Area 28.27 sq. in.
I
Signature: Kevin Tucker, Supervisor, CMT
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results preaented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {compoaition, appearance, perlormance, etc.) or any other feature of similar subject matter provided by
parsons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports~D7429-O73-98~ST March 16, 1998