Loading...
Mansions Phase 1-LR 980316 (2) Rone Engineers, Inc. 11234 Goodnight Lane Tel. (972) 241-451. ineers Dallas/For1 Worlh Dallas. Texas ~ Metro (972) 263-1555 75229 , Fax (972} 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-073 I Date of Observation 3/04/98 Report Date 03/16/98 I To Western Rim Services Location PAVING, FIRE LANE, SOUTH SIDE AT SOUTHEAST CORNER OF BUILDING #39 Contractor Supplier LATTIMORE I Plant 3 I Truck 756 Ticket 3058416 Time Sampled 10:10 Time Batched 9:22 Weather Condition PT CLOUDY Concrete Temperature (°F) 62 Ambient Temperature (°F) 60 Mix Number 61 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.5 ENTRAINED AIR {%) 4.5 Concrete Cylinder Test(s) ] I T°tal L°ad IC°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 37A 7 3/11 90000 3180 3000/28 DAYS B 28 4/01 C 28 4/01 D H Curing Method ] Test Method Standard 6" x 12" I Engineer/Technician G. BEALL ASTM C 31I ASTM C 39 Area 28.27 sq. in. I Signature: Kevin Tucker, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results preaented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality {compoaition, appearance, perlormance, etc.) or any other feature of similar subject matter provided by parsons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports~D7429-O73-98~ST March 16, 1998