Loading...
Mansions Phase 1-LR 980316 (8) !i Rone Engineers, Inc. 11;~34 Goodnight Lane Tel. (972) 241-45',. RoneEn ,ineers Dallas/Fo~, Wort~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-034 Date of Observation 2/11/98 Report Date 03/16/98 To Western Rim Services Location PAVEMENT - 60' EAST THROUGH MAIN ENTRANCE AND 70' NORTH AT CENTER LINE Contractor Supplier LATTIMORE I Plant 7 I Truck 457 Ticket 7046633 I I Time Sampled 9:20 Time Batched 8:23 Weather Condition CLEAR Concrete Temperature (°F) 51 Ambient Temperature (°F) 42 Mix Number Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 4.5 ENTRAINED AIR (%) 5.0 Concrete Cylinder Test(s) I IT°tal L°ad Compressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 9A 7 2/18 69000 2440 3000/28 DAYS B 28 3/11 101000 3570 C 28 3/11 1 05000 3710 D H Curing Method I Test Method Standard 6" x 12" I Engineer/Technician R. CROWDER ASTM C 31I ASTM C 39 Area 28.27 sq. in. I Signature: Kevin Tucker, Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin~reports\D7429-O34-98\ST March 16, 1998