Loading...
Mansions Phase 1-LR 980313 (17) Rone Engineers, Inc. 1' ~, Goodnight Lane TeL t972) 241-451- RoneEnQineers Dal,as,'Forl, 'Worll~ Dallas. Texas Metro (972) 263-1555 il 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-029 I Date of Observation 2/10/98 Report Date 03/13/98 To Western Rim Services Location PAVEMENT AT MAIN ENTRANCE, 40' EAST AT CENTER LINE, NORTH BOUND SIDE Contractor Supplier LATTIMORE Plant 7 I Truck 574 Ticket 7046589 Time Sampled 10:00 Time Batched 9:38 Weather Condition CLOUDY/RAIN Concrete Temperature (eF) 61 Ambient Temperature (°F) 55 Mix Number Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 6.0 ENTRAINED AIR (%) 4.8 Concrete Cylinder Test(s) Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 6A 7 2/17 63000 2230 3000/28 DAYS B 28 3/10 101000 3570 C 28 3/10 100000 3540 D H Curing Method I Test Method Standard 6" x 12" Engineer/Technician R. CROWDER ASTM C 31I ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, ~k Supervisor, CMT Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive uae of the clients to whom they are addressed. c:\wpwin\reports\D7429-O29-98\ST March 13, 1998