Mansions Phase 1-LR 980313 (02) Rone Engineers, Inc. 1" t Goodnight Lane , Tel. (972) 241-451- RoneEnlineers
Dallas/Fort Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-052 I Date of Observation 2/28198 Report Date 03/13/98
I
To Western Rim Services
Location PAVING, MAIN ENTRANCE CIRCLE DRIVE BY CLUB HOUSE, 75' WEST, 5' NORTH FROM SOUTHWEST CORNER
OF CLUB HOUSE
Contractor
Supplier LATTIMORE Plant 7 I Truck 576 Ticket 7047420
I
Time Sampled 6:40 Time Batched 6:03 Weather Condition PT CLOUDY
Concrete Temperature (°F) 66 Ambient Temperature (°F) 43 Mix Number 38
Mix Description 5 SACKS WITH AIR Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 6 1/2
ENTRAINED AIR (%) 4.7
Concrete Cylinder Test(s)
Specimen Age Test Date
No. {Days) (lbs.) Strength (psi} Strength Required (psi}
20A 7 3/07 100000 3540 /28 DAYS
B 28 3/28
C 28 3/28
D H
CuringMeth°d I TestMeth°d I Standard 6" x12" I Engineer/TechnicianR'LOVELADY, j
ASTM C 31 ASTM C 39 Area 28.27 sq. in. I
Signature: Kevin Tucker, Supervisor, CMT ~
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality {composition, appearance, peHormanca, etc.} or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive uae of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O52-91~ST March 13, 1998