Loading...
Mansions Phase 1-LR 980313 (05) Rone Engineers, Inc. 1', 4 Goodnight Lane Tel. (972) 241-451 ineers Dallas,'Fon Worth Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-055 I Date of Observation 2/28/98 Report Date 03/13/98 I To Western Rim Services Location PAVING, 5' NORTH, 10' EAST FROM NORTHEAST CORNER OF LOT //41 Contractor Supplier LATTIMORE I Plant 7 I Truck 573 Ticket 7047460 Time Sampled 11:30 Time Batched 11:00 Weather Condition CLEAR Concrete Temperature (°F) 68 Ambient Temperature (°F) 47 Mix Number 61 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 4.8 Concrete Cylinder Test(s) Specimen AgeI I Total Load Compressive No. (Days) Test Date (lbs.) Strength (psi) Strength Required (psi) 23A 7 3/07 85000 3010 3000/28 DAYS 8 28 3/28 C 28 3/28 D H Curing Method I TestMethod Standard 6" x12" I Engineer/TechnicianR. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, Supervisor, CMT ~ Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject mat'tar provided by persons or conditions over which wa have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O55-98\ST March 13, 1998