Mansions Phase 1-LR 980313 (08) Oa,,as/¢on Wo~h Dallas. Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-059 Date of Observation 3102198 Report Date 03/13/98
To Western Rim Services
Location FIRE LANE BETWEEN APARTMENTS 34 AND 43
Contractor
Supplier LATTIMORE Plant 7 I Truck 761 Ticket 7047513
I
Time Sampled 9:15 Time Batched 8:34 Weather Condition CLEAR
Concrete Temperature (°F) 56 Ambient Temperature (°F) 40 Mix Number 61
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5.0
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
26A 7 3/09 94000 3330 3000/28 DAYS
B 28 3/30
C 28 3/3O
D H
Curing Method ] Test Method I Standard 6" x12" I Engineer/TechnicianG. BEALL
ASTM C 31 ASTM C 39 Area 28.27 sq. in.
Signature: Kevin Tucker, Supervisor, CMT ~'
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. Wa assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O59-98~ST March 13, 1998