Mansions Phase 1-LR 980312 Da.as. ¢orl '/,/on;" Dallas. Texas Metro ,1972) 263-: 555
75229 Fax (972'.., 241-5' 7"
REPORT OF FIELD INSPECTION OF CONCRETE
TESTED FOR: Western Rim Services PROJECT: Mansion By The Lake
DATE: March 12, 1998 OUR REPORT NO.: 3137-D7429-081
FIELD DATA:
No of Concrete Water Air Ambient Concrete
Set Cylinders Supplier Ticket Time Truck Time Yards of Added Slump Content Tamp Tamp
No Made Number Loaded Sampled Concrete (Gal) (In) (%) °F °F
43 4 7048104 8:30 8:40 -- 0 7 N/A 39 50
44 4 7048118 10:00 10:10 -- 0 7 N/A 39 57
LOCATION:
43 BUILDING 25 SLAB, 10' NORTH BY 10' EAST OFF SOUTHWEST CORNER
44 BUILDING 25 SLAB, 10' SOUTH BY 15' WEST OFF NORTHEAST CORNER
REMARKS:
TECHNICIAN: D. GODBEY
DISTRIBUTION:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
Kevin Tucker,
CMT Supervisor
Rone Engineers, Inc.
LIMITATIONS: The teat results presented herein were prepared baaed upon the specific samples provided for testing, We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports~D7429-O81-98~ST March 23, 1998