Loading...
Mansions Phase 1-LR 980312 (5) Rone Engineers. Inc. 1. .4 Goodnight Lane Tel. (972) 241-451 ineers Dallas/For1 Wortl~ Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-045 I Date of Observation 2/25/98 Report Date 03/12/98 I To Western Rim Services Location PAVING, EAST SIDE PAD //28, 75' SOUTH, 15' EAST FROM NORTHEAST CORNER OF PAD SITE //28 Contractor Supplier LATTIMORE I Plant 6 I Truck 454 Ticket 6066978 I I Time Sampled 10:00 Time Batched 10:45 Weather Condition CLOUDY Concrete Temperature (°F) 72 Ambient Temperature (°F) 56 Mix Number 40 Mix Description Unit Weight Water Added NONE Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 5.5 Concrete Cylinder Test(s) I I T°tal Load IC°mpressive Specimen Age Test Date No. (Days) (lbs.) Strength (psi) Strength Required (psi) 16A 7 3/04 103500 3660 3500/28 DAYS B 28 3/25 C 28 3/25 D H Curing Method I Test Method Standard 6" x12" I Engineer/TechnicianR. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, Supervisor, CMT f Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, perfo~ance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive uae of the clients to whom the*/are addressed. c:\wpwin\reports\D7429-O45-98\ST March 12, 1998