Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-046 Date of Observation 2/25/98 Report Date 03/12/98
To Western Rim Services
Location PAVING, NORTH OF PAD //28, 145' EAST, 10' NORTH 'FROM NORTHEAST CORNER OF PAD SITE //28
Contractor
Supplier LATTIMORE Plant 7 I Truck 573 Ticket 7047289
Time Sampled 12:05 Time Batched I 1:20 Weather Condition PT CLOUDY
Concrete Temperature (°F) 75 Ambient Temperature (°F) 56 Mix Number 40
Mix Description Unit Weight Water Added NONE
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR (%) 5.7
Concrete Cylinder Test(s)
Specimen Age I Test Date l Total Load J Compressive
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
17A 7 3/04 96000 3400 3500/28 DAYS
B 28 3/25
C 28 3/25
D H
AsTMCuringMoth°d I TestMeth°d I Standard 6" x12" I Engineer/TechnicianR'LOVELADYc31 ASTMC39 Area 20,27 sq. in.
Signature: Kevin Tucker, Supervisor, CMT ~
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
{1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared baaed upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-046-98\ST March 12, 1998