Mansions Phase 1-LR 980312 (7) Rone Engineers, Inc. 11 ~ Goodnight Lane Tel. (972) 241-451; ineers
Da~las,'Fort Worth Dallas, Texas Metro (972) 263-1555
75229 Fax (972) 241-5174
Concrete Cylinder Test Report
Project Mansion By The Lake Purchase Order
Number 3137-D7429-047 I Date of Observation 2/25/98 Report Date 03/12/98
I
To Western Rim Services
Location PAVING, EAST SIDE PAD #44, 60' NORTH, 10' EAST FROM SOUTHEAST CORNER OF PAD SITE //44
Contractor
Supplier LATTIMORE IPlant3 ITruck898 Ticket 3058008
Time Sampled 1:15 Time Botched 12:47 Weather Condition PT CLOUDY
Concrete Temperature (°F) 75 Ambient Temperature (°F) 58 Mix Number 40
Mix Description Unit Weight Water Added NONE '
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5 1/2
ENTRAINED AIR {%) 5.2
Concrete Cylinder Test(s)
Specimen Age Test Date
No. (Days) (lbs.) Strength (psi) Strength Required (psi)
18A 7 3/04 105000 3710 3500/28 DAYS
B 28 3/25
C 28 3/25
D H
ASTM C 31 ASTM C 39 Area 28.27 scl. in.
Signature: Kevin Tucker, Supervisor, CMT f
Remarks and/or Distribution
Distribution:
(1) Mr. Richard E. Simmons; Western Rim Services
(1) Mr. Larry Davis; City of Coppell
(1) Mr. Lee Stone; City of Coppell
(1) Mr. Tony Martin; Newport Classic
(1) Mr. Doyle Damron; C. D. Construction Consulting
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, perfonaance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive usa of the clients to whom they are
addressed.
c:\wpwin\reports\D7429-O47-98~..ST March 12, 1998