Loading...
Mansions Phase 1-LR 980312 (8) Rone Engineers, Inc. 11 ~ Goodnight Lane Tel. (972) 241-4517 ineers Dallas,-'Fo~ Worlh Dallas. Texas Metro (972) 263-1555 75229 Fax (972) 241-5174 Concrete Cylinder Test Report Project Mansion By The Lake Purchase Order Number 3137-D7429-048 Date of Observation 2/25/98 Repor~ Date 03/12/98 To Western Rim Services Location PAVING SOUTH OF LOT //7, 20' SOUTH, 5' WEST FROM SOUTHWEST CORNER OF LOT #7 Contractor Supplier LATTIMORE I Plant 6 I Truck 808 Ticket 6067013 I I Time Sampled 2:45 Time Batched 1:15 Weather Condition PT CLOUDY Concrete Temperature (°F) 77 Ambient Temperature (°F) 62 Mix Number 40 Mix Description Unit Weight Water Added 10 GALLONS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5.0 ENTRAINED AIR (%) 5.§ Concrete Cylinder Test(s) Specimen Age Test Date No. {Days) (lbs.) Strength {psi) Strength Required (psi) 19A 7 3/04 101000 3570 3500/28 DAYS B 28 3/25 C 28 3/25 D H Curing Method I Test Method Standard 6" x12" I Engineer/TechnicianR. LOVELADY ASTM C 31 ASTM C 39 Area 28.27 sq. in. Signature: Kevin Tucker, Supervisor, CMT f Remarks and/or Distribution Distribution: (1) Mr. Richard E. Simmons; Western Rim Services (1) Mr. Larry Davis; City of Coppell (1) Mr. Lee Stone; City of Coppell (1) Mr. Tony Martin; Newport Classic (1) Mr. Doyle Damron; C. D. Construction Consulting LIMITATIONS: Thc test results presented herein were prepared baaed upon the specific samplea provided for testing. We assume no responsibility for variation in quality {compoeition. appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. c:\wpwin\reports\D7429-O48-98\ST March 12. 1998