WA9302-LR 950921['~'EOTECHNICAL
E GEE Consultants, Inc.
E
iNViRONMENTAL
2540 Glenda Lane · Suite 108 · Dallas, Texas 75229 · (214) 620-9791 · Fax (214) 620-9794
GBNERAL REPORT
Report Date Septembe~ 2~, ]995 Test Date: Septembe~ 20, ~995
Cliem Cjty of Coppert (3e~e~al Report No.: 3
Project 6.0 MG Wate~ Storage Taffi¢ Project No.: 95-0220
]demification Ca~cellatio~
Method of Test N/A
Results
Scheduled time: 8:00 am
Type of service scheduled: Pier Inspection
Time left lab: 7:15 am
Time arrived at job: 7:45 am
Time left job: 9:45 am
Time returned lab: 10:15 am
Total Charged Time: 3.0 hrs.
Reason: Natgun asked technician to wait to see if pier drillers would be able to access site after light rain on
9/19/95. Site was too wet.
Technician: P.Chen
cc: Mr. Larry Davis - City of Coppell
Mr. Bob Barbarisi, Jr. - Natgun Corporation
Mr. Gary Hendricks - Shimek, Jacobs and Finklea